My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
607 RIVERSIDE RD AMAZON 2024-05-02
>
Address Records
>
RIVERSIDE RD
>
607
>
AMAZON
>
607 RIVERSIDE RD AMAZON 2024-05-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2024 8:01:21 AM
Creation date
2/11/2024 11:19:40 AM
Metadata
Fields
Template:
Address Document
Street Name
RIVERSIDE RD
Street Number
607
Tenant Name
AMAZON
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LE LOEB <br /> ELECTRIC <br /> ■ Balance of PO issued upon completion of scope review, proposal approval <br /> o Provide and maintain contractor's Dashboard <br /> • This dashboard is intended to be a tool and communication medium for many aspects of <br /> this program including tracking material, KPI tracking, and site/outage information. <br /> • Amazon <br /> o Overall Program direction <br /> o Provide site specific detail for guidance on installation including existing documentation and one <br /> lines. <br /> o Executive schedule of program <br /> o Provide a site escort(s) for the data-collection process. If a site escort is not available and the <br /> infrared screw is permitted to walk freely throughout the building, the name/ number of an onsite <br /> contact must be provided to answer any questions. <br /> o Maintaining engineering and design schematics throughout program. <br /> o Tasks needed for site operations in readiness for the outage. <br /> o Personal evacuation <br /> o Contacting the fire department etc. <br /> o SIM tickets <br /> • VEEC <br /> o Understand and utilize the smart sheet dashboard. <br /> o Resource management for volume of work and intended deadlines <br /> o Resource supervision and on site coordination. <br /> o Site walk data collection <br /> o Day of outage reporting <br /> o Develop critical load plans <br /> 2.0 Preventative Maintenance (PM) <br /> 2.1 PM Scope of Work <br /> The electrical testing scope of the outage is further defined in Appendix A - it shall include: <br /> • Medium Voltage Equipment—when owned by Landlord or Amazon <br /> o Switchgear <br /> o Relays <br /> o Load Break Switches <br /> o Power Transformers <br /> • IR windows to be installed if don't currently exist <br /> ■ If oil filled padmount, plumb out kit to be installed for online oil sampling <br /> o MV cables to be VLF/TD <br /> • Cables under 1 00f only to have VLF performed <br /> • 800 Amp switchboards and feeder cables <br /> • 480VAC &600VAC Equipment <br /> o Main Switchboards (MSB) <br /> o Main Breaker <br /> o Solar Main Breaker <br /> o Generator Main Breaker <br /> o Protective Relays <br /> o Critical Outgoing Cable from MSB <br /> ■ Switchboard Feeders <br /> • Emergency Feeders <br /> o Electric Fire Water Motor Starter and associated electrical equipment (if applicable) <br /> o Automatic Transfer Switches <br /> 13Page <br />
The URL can be used to link to this page
Your browser does not support the video tag.