LE LOEB <br /> ELECTRIC <br /> • Optional NETA Tests shall not be run <br /> • Primary injection shall not be performed on breakers, secondary injection on all breakers with electronic trip unit <br /> • Contact resistance shall only be run on breakers 300AT and larger. All breakers on the MSB should be isolated <br /> downstream when possible and insulation resistance performed. <br /> • All breakers on MSB should be operated and visually inspected <br /> A heightened attention to detail should be applied when evaluating the existing conditions. Opportunities <br /> to look for include, but are not limited to: <br /> • Cables routed behind or near panel cover screw entry points. <br /> • Re-route or safely secure cables out of the way. <br /> • Panel cover is not safely latched. <br /> • Cable bend radius <br /> • Any sharp edges found within the interior of the panel or cover that is in proximity or direct contact <br /> • with cabling. <br /> • Apply edging to any sharp edges found. <br /> • Incorrect and /or missing hardware within the bus system. <br /> • Replace missing or incorrect hardware as needed. <br /> • Validate if there is a barrier between the main breaker section and the distribution section. <br /> • Install sheet of G-10 Glastic if feasible <br /> • Tools left within gear(i.e screwdriver). <br /> • Visual Inspection of Grounding <br /> • Visual inspection of the Neutral bonding <br /> Any opportunities found within a panel that are deemed unsafe should be corrected during the PM <br /> when possible. <br /> The planned, standard shutdown is expected to not exceed 12-14 hours, unless otherwise altered prior to <br /> start of site planning meetings. Each site should be carefully evaluated prior to the shutdown to ensure it <br /> is staffed properly and any planned maintenance does not exceed the 12-14-hour window. If any life-safety <br /> concerns are identified within the gear during the outage, every effort to remedy before completion should <br /> be explored, even if 12-14-hour timeframe will be exceeded. Amazon and VEEC POCs are to be notified <br /> immediately so appropriate considerations can be made. <br /> 2.2 PM - Comprehensive Preventive Maintenance Strategy <br /> • Verify equipment nameplate. <br /> • Record incoming system voltages for all three phases. <br /> • Record amperages at main circuit breaker for all three phases and neutral. <br /> • Remove, inspect, and replace covers. <br /> • Inspect condition—mechanical, electrical, physical. <br /> • Inspect Grounding System <br /> • Inspect torque of connections and terminations. [on steel bolted connections] <br /> • Inspect installation—anchorage, clearances, alignment. <br /> • Exercise active components as applicable. <br /> • Inspect mechanical indicators—operation and indication. <br /> • Clean interior and exterior of equipment. <br /> • Apply lubrication as appropriate. <br /> • Conduct minor repairs as needed. <br /> 14Pag <br />