My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
607 RIVERSIDE RD AMAZON 2024-05-02
>
Address Records
>
RIVERSIDE RD
>
607
>
AMAZON
>
607 RIVERSIDE RD AMAZON 2024-05-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2024 8:01:21 AM
Creation date
2/11/2024 11:19:40 AM
Metadata
Fields
Template:
Address Document
Street Name
RIVERSIDE RD
Street Number
607
Tenant Name
AMAZON
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LE LOEB <br /> ELECTRIC <br /> • Conduct analysis—test results and trends. <br /> • Follow Amazon Switching procedure as outline in Appendix F <br /> • Where applicable remove any auxiliary protection relays; such as voltage relays, <br /> etc,. <br /> • VEEC to be provided [any available] engineering drawings (floor plans and one-line <br /> diagrams), <br /> • maintenance history, information of requirements/operational impact to the facility. <br /> • VEEC to provide comprehensive engineering report including equipment tested, findings, <br /> test data, and recommendations after completion of work. <br /> • VEEC to sync PowerDB data to Amazon server and provide PDF copy of report. <br /> • All deficiencies to be properly documented and corrective work scheduled if unable to <br /> repair immediately.Issue a 'Work from PM' work order for follow up repairs. <br /> • Ensure equipment is functioning appropriately and safely before returning to operations. <br /> • Ensure equipment and work area is clean prior to leaving work site. <br /> • Upload all inspection records- site specific, VEEC [VEEC Project Manager] etc. - to work <br /> order. <br /> • If any deficiencies are discovered and unable to repair immediately, schedule follow up <br /> date with VEEC [VEEC Project Manager to coordinate] and issue a new PO for the follow-up <br /> work. Issue a new 'Work from PM' work order. Provide adequate lead time for <br /> parts/scheduling. VEEC to provide proposal for any follow-up repairs. <br /> • Perform Testing in compliance with Amazon requirements <br /> 2.3 PM Division of Responsibilities <br /> • Amazon <br /> o Provide site one-line drawings at time of bidding work(when one-lines are available) <br /> o Provide copy of last completed arc flash study and corresponding .skm file if <br /> available (when applicable) <br /> o Provide a means to reach any equipment located above ground level <br /> o Provide list of IR deficiencies <br /> • Loeb <br /> o Provide professional project management services <br /> o Lead all communications between stakeholders, including but not limited to: <br /> ■ Amazon Corporate <br /> ■ Amazon Site Facility Vendor <br /> ■ Utility/ Power <br /> o Coordinate power outage with all stakeholders, contractors, and utilities providers. <br /> • VEEC <br /> o Serve as a technical lead during outage. <br /> o Perform visual and mechanical inspection, and electrical testing as specified <br /> o Document equipment and settings so that information may be loaded into a centralized data base. <br /> o Provide Loeb with inspection report within (15) business days after utility outage. <br /> o Perform necessary adjustments,which are required to bring equipment to satisfactory operating <br /> condition, or review these with EC prior to commencement of any additional work <br /> o Provide and install safety locks, as required, and in accordance with the facility safety guidelines <br /> o Provide all temporary lighting, generators, and tools required to complete work during a utility <br /> outage. <br /> • VEEC must identify need for temporary generators and temporary lighting during site <br /> wa I k(s). <br /> o Perform voltage test and install necessary circuit/equipment safety ground to assure safe working <br /> conditions <br /> 151 Page <br />
The URL can be used to link to this page
Your browser does not support the video tag.