My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
607 RIVERSIDE RD AMAZON 2024-05-02
>
Address Records
>
RIVERSIDE RD
>
607
>
AMAZON
>
607 RIVERSIDE RD AMAZON 2024-05-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2024 8:01:21 AM
Creation date
2/11/2024 11:19:40 AM
Metadata
Fields
Template:
Address Document
Street Name
RIVERSIDE RD
Street Number
607
Tenant Name
AMAZON
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LE LOEB <br /> ELECTRIC <br /> 3.1 Infrared Window Division of Responsibilities <br /> • Amazon <br /> o Review additional IR windows outside of MSB during scope <br /> review call. <br /> • Loeb <br /> o Contact local utility to schedule utility outage <br /> o Provide IR windows (Will ship to VEEC or EC) <br /> o Fluke CV300 3"IR Window Round <br /> ■ https://www.fluke.com/en-us/product/thermal-imaqinq/ir-windows/fluke-cv300 <br /> o IR Windows will ship directly to VEEC or EC.IR Windows will never be shipped <br /> to site. <br /> • VEEC/Loeb approved EC <br /> o Will determine optimal placement of IR windows based on the instruction above <br /> o Will install windows the manufacturers installation instructions provided in Appendix H <br /> • Report any IR Windows shortages to the Loeb Project Manager. <br /> o Provide photos of each switchboard after IR windows have been installed, photos should <br /> show all sides where IR windows were applied. <br /> o Follow PPE guidelines described in NFPA 70E-2018,Article 130.7(A) <br /> 3.2 Infrared Window Installation Timeline <br /> All windows must be installed during the utility outage along with the PM and Arc Flash Relay Installation. <br /> 4.0 Arc Flash Relay Installation <br /> 4.1 Arc Flash Relay Scope of Work <br /> During the scheduled utility outage, a Loeb provided arc flash relay will need installed at each main utility <br /> Service entrance panel of the facility that the incident energy on the bus is greater than 12 cal/cm^2.This <br /> includes installation of an alarm/beaconing device to notify the facility if the relay has failed. <br /> Note: Upon installation of the arc flash relays,the existing arc flash labeling will no longer be accurate. <br /> Arc flash labeling will need updated upon completion of arc flash relays and programming. Arc flash <br /> labels will not be update for relays installed on BPS. Refer to Appendix P for further guidance on <br /> labeling. <br /> Immediately after the utility outage, an arc flash label must be installed at the main breaker.If the arc <br /> flash study has not been completed or is unavailable, it is acceptable to calculate new incident energy <br /> utilizing infinite bus method. <br /> Arc flash relays will require existing equipment to have a shunt trip device installed and close coil when <br /> applicable. If this function does not exist on the existing equipment, a shunt trip device will need to be <br /> included in the BOM and Proposal. <br /> The Arc Flash requires protection class CTs and UPS power supply, for details of all components see BOM <br /> on Appendix G.Any deviation from components needs to be approved by Amazon RME Engineering <br /> team through Loeb. <br /> 17Page <br />
The URL can be used to link to this page
Your browser does not support the video tag.