LE LOEB <br /> ELECTRIC <br /> ■ It is important to understand that the outage timeframe only encompasses what <br /> is detailed in the AFRI project and does not include any site level tasks, such as <br /> load-shedding of equipment, scattering AR drives, and restoring downstream <br /> power.This will lead to an operational outage timeframe of 14-18 hours. <br /> Contractors are not expected to remain on site for the full operational outage. <br /> ■ The MDF Room will require special access and a specific date and time must be <br /> scheduled through Loeb to ensure the access. <br /> • Avetta Requirements: All contracted parties working on Amazon job sites must be registered <br /> with Avetta and remain in compliance. Contracted parties must notify Loeb of the names of any <br /> sub-contracted electricians or engineer support no later than 2-weeks from time of scheduled <br /> utility outage.It is required that all contracted parties provide a screenshot showing Avetta <br /> compliance to Loeb for themselves and any third parties that are sub-contracted. <br /> o Any Avetta compliance issues must be addressed with Avetta directly. <br /> • Breaker Switching (After Utility Outage): Upon installing the arc flash relays, a standard <br /> switching procedure has been defined and must be followed at time of building re- <br /> energization. No one is permitted to be in the room or near any free-standing switchgear <br /> when power is re- energized. NFPA 70E safety standards must always be followed. See <br /> Appendix F for switching procedures.Written step by step Switching document to be provided <br /> from the VEEC to Amazon prior to outage. The responsible party for switching must be QEV <br /> certified in Avetta. <br /> • Completion: <br /> o Prior to the building getting re-energized, the VEEC Lead must conduct a review of <br /> deficiencies with on-site Amazon members from Site RME teams and Owner's <br /> Representative. <br /> o A sign off from Amazon/amazon representative is required on execution checklist before <br /> energization. <br /> o Contractors are not permitted to leave the job site until Amazon has confirmed that all <br /> systems have power and all ATS have transferred back to normal source <br /> • Deadline: Deadlines will be site specific, but the general timeline for each site is as follows: <br /> o Arc Flash Label Application: Complete immediately after AFRI, prior to leaving thejob <br /> site. "Old" labels must be removed once new labels are installed. <br /> o AFRI: Is limited to a pre-approved, site-specific timeline,which includes a utility outage. <br /> Once this date and time are finalized, it cannot be changed by anyone other than <br /> Amazon. <br /> • PM Maintenance Report: Must be submitted to Loeb within (15) business <br /> days of outage and Amazon Workdocs location. See Appendix U for Report <br /> Template. <br /> ■ Any work found during the AFRI process that could not be addressed during <br /> outages must be quoted to Loeb within (5) business days of the outage.If the <br /> VEEC is unable to provide a quote within (5) business days, the VEEC is required <br /> to inform Loeb so other accommodations can be made. <br /> o IR Scanning: Only required if thermal deficiency was corrected during the outage <br /> ■ Scan must be completed the following day when the building is under normal operational <br /> load. <br /> • Scan must be completed by minimum of level 1 certified individual. <br /> ■ Only scanning specific equipment that was corrected not a site wide scan. <br /> 51 Pad <br />