My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1318 75TH ST SE 2024-03-01
>
Address Records
>
75TH ST SE
>
1318
>
1318 75TH ST SE 2024-03-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2024 3:57:39 PM
Creation date
2/13/2024 11:03:33 AM
Metadata
Fields
Template:
Address Document
Street Name
75TH ST SE
Street Number
1318
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
312
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT <br />WASHI NGTON <br />June 16, 2022 <br />CITY OF EVERETT <br />Permit Services <br />Soniya Moon <br />Blue Moon Realty LLC <br />4905 33rd St CT NE Tacoma, WA 98422 <br />Email Address: soheemoon.96@gmail.com <br />Bluemoonrealty.wa@gmail.com <br />RE: Owner: Soniya <br />Job Address: 1318 75t" St SE Everett, WA 98203 <br />Plan Check Number: B2201-048, 2nd Building Review <br />Dear Soniya, <br />We have reviewed the responses to the First Review letter dated April 20, 2022. Some comments <br />have not been completely addressed and require additional action before a permit can be issued. <br />Additional comments have also been included based on a review of the revised construction <br />drawings. These comments address building issues only. Additional revisions or additions may be <br />required by other departments including Public Works, Planning, and Fire. <br />The resubmittal documents did not include an itemized review letter. A letter should be provided <br />as requested per Item (a) below to clearly indicate how each comment has been addressed. <br />In order for the processing of your application to continue, the following documentation shall be <br />submitted to Permit Services for review: <br />a. Itemized letter addressing the comments provided below. <br />b. Two complete sets of revised construction drawings. <br />c. Two copies of supplemental structural calculations (if appliable). <br />Submittal documents should contain sufficient information and detail to review the proposed project <br />for compliance with the adopted building codes. Upon submittal of the revised documents, your <br />application will be given priority and the review will recommence. <br />Page 1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.