My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Hultz BHU Engineers Inc. 2/15/2024
>
Contracts
>
6 Years Then Destroy
>
2024
>
Hultz BHU Engineers Inc. 2/15/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/27/2024 2:37:23 PM
Creation date
2/16/2024 9:11:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Hultz BHU Engineers Inc.
Approval Date
2/15/2024
End Date
12/31/2024
Department
Procurement
Department Project Manager
Theresa Bauccio-Teschlog
Subject / Project Title
RFQ - Everett Station HVAC controls replacement and maintenance
Tracking Number
0004188
Total Compensation
$194,090.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
Hultz BHU Engineers, Inc. 11/26/2024 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
2 <br />SCHEDULE <br />The following anticipated schedule contains major milestones and may be modified: <br />September 28, 2023 Release of Request for Statement of Qualifications <br />October 26, 2023 Submittals Due <br />No later than: <br />October 27, 2023, at <br />12:00 p.m. <br />Provide an electronic copy of submittal. <br />November 20, 2023 Potential Interviews of Shortlisted Firms <br />December 2023 Selection of Preferred Architect or Engineer <br /> <br />NUMBER OF COPIES REQUIRED <br />Proposers must submit one unbound original statement of qualifications and one bound copy in a sealed envelope. <br />The project name must be clearly indicated on the outside package. One electronic copy in Adobe Acrobat PDF file <br />format is required to be e-mailed to the RFQ coordinator and received no later than one day after submittals are due. <br />SECTION ONE <br />1.1 SCOPE OF SERVICES FOR ALL THREE PROPOSED PROJECTS <br />Services must consist of the following: <br />A. Design Development <br />o Design Development Phase – the Architect or Engineer (A/E) shall provide those services <br />necessary to prepare 30% design documents, the design development documents consisting of <br />drawings and other documents to fix and describe the size and character of the entire project <br />for approval by the City. <br />o Permit Design Phase – the A/E shall provide those services necessary to prepare permit design <br />documents, the design development documents consisting of drawings and other documents to <br />fix and describe the size and character of the entire project for approval by the City. <br />o The City wishes to utilize state of the art techniques and technology for this project. <br />Consideration must be given to availability of materials, equipment and labor, construction <br />sequencing and scheduling, user safety, and maintenance requirements. <br />o All three project design phases will run concurrently. <br />B. Permit Documents <br />o Permit Documents – the A/E must provide the services necessary to prepare for approval by the <br />City, all permit related documents. <br />o Permit Documents must consist of drawings, specifications, and other documents required by <br />Local, State, and Federal Agencies. <br /> <br />C. Construction Documents
The URL can be used to link to this page
Your browser does not support the video tag.