My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1820 100TH PL SE Plans 2024-03-11
>
Address Records
>
100TH PL SE
>
1820
>
Plans
>
1820 100TH PL SE Plans 2024-03-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2024 3:58:47 PM
Creation date
3/11/2024 3:57:39 PM
Metadata
Fields
Template:
Address Document
Street Name
100TH PL SE
Street Number
1820
Permit
B1801-042
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br /> � Pa e 6 <br /> , DOORS AND WINDOWS <br /> 601 - INTERIOR DOORS <br /> Scope of Work <br /> • Adjust interior door to front office room (see Demolition Plan for location) to operate properly. Door will <br /> be made to operate properly via <br /> • Adjustment of the hinges ' <br /> • Shaving or trimming door or frame <br /> 605—WINDOWS <br /> Scope of Work <br /> All new windows will be manufactured by Milgard or Jeld Wen or Skyline with the following specifications. <br /> • Contractor to supply and install 4 new windows. However contractor reserves right to reuse frames <br /> and have glass and/or frame repaired <br /> • Configuration will be similar to existing <br /> • Anodized aluminum, similar to existing windows <br /> • Double pane glazing, low E, argon gas filled <br /> • Screens for all operable portions <br /> • Reinstall Windows treatment-blinds <br /> Note—The 4 windows to be replaced are shown on the Demolition Plan. <br /> FINISHES <br /> 701 - DRYWALL <br /> Scope of Work <br /> Provide and install the following. New gypsum drywall will be '/2" for walls and ceilings. All corners will <br /> have standard straight-edge detail. <br /> • New drywall in all areas where removed, shown on the Demolition Plan <br /> • Texture to be skip splatter on walls and ceiling, similar to the existing texture <br /> 7020 - INTERIOR PAINTING <br /> Scope of Work <br /> Contractor will apply one coat semigloss latex primer and two finish coats latex paint for all disturbed <br /> areas. <br /> • Includes application of one color <br /> • Includes caulking and preparation for painting <br /> • Primer and paint will be manufactured by Sherwin Williams or Benjamin Moore, or equivalent <br /> 7021 - EXTERIOR PAINTING <br /> Scope of Work <br /> Contractor will apply one coat latex primer and two coats latex exterior paint for the entire exterior East <br /> face. Primer and paint will be manufactured by Sherwin Wifliams or Benjamin Moore. <br /> • Includes application of a total of finro colors <br /> • Contractor will color match existing siding colors, as close as reasonable practical. <br /> • Inciudes caulking and preparation for painting. <br /> Not Included in Contract <br /> • Painting remainder of building siding or interior of non-damaged areas <br /> 706- CARPET <br /> Scope of Work <br /> ' • Contractor will have carpets cleaned in the 3 offices and hallway where the repair is occurring ,.��,t:,�:--�- <br /> � � <br /> • Owner's Initials � I ��� <br /> .�� <br /> �� <br />
The URL can be used to link to this page
Your browser does not support the video tag.