My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1300 100TH PL SE CITY KIDS DAY CARE 2025-05-02
>
Address Records
>
100TH PL SE
>
1300
>
CITY KIDS DAY CARE
>
1300 100TH PL SE CITY KIDS DAY CARE 2025-05-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2025 7:54:02 AM
Creation date
3/11/2024 4:04:53 PM
Metadata
Fields
Template:
Address Document
Street Name
100TH PL SE
Street Number
1300
Tenant Name
CITY KIDS DAY CARE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A <br /> 16, The City of Everett Fire Department determined that access to the site and the <br /> locations of the fire hydrants were acceptable. The fire flow requirements for the <br /> proposed structure will be 1.500 gallons per minute, The Applicant will be required to <br /> provide portable fire extinguishers with a UL rating of -A.t -B.C, and they will be <br /> required at;5,f et intervals on a;l floors of the building to be constructed. In addition. <br /> an automatic fire detention system will be required. The Applicant must satisfy all fire <br /> hydrant regulations. All plans for the fire systems must be submitted to the Fire <br /> Marshal (exhibit t 5) <br /> 17. The proposed project will be consistent with all Federal and State laws and <br /> regulations. (wig testimony) <br /> 18. Notice was given pursuant to the requirements of the State of Washington and the City <br /> of Everett. No pu -testimony was submitted at the hearing. <br /> Junsdic : The nearing Examiner of the City of Everett hasfurisdictional authority to hold <br /> a hearing and to issue the decision. That authority is set forth in EMC Z23.120. Based on <br /> the above Findings of Fact, the Hearing Examiner enters the following Conclusions: <br /> CONCLUSIONS <br /> 1. The Applicant requested approval of a Sperm Property Use Permit for the <br /> construction of a single-story it -fr: 3,0 square foot daycare facility(Everett <br /> Country Club Daycare)with six off-street parking stabto be developed at 13 1 OO ' <br /> Place SE. Everett,Washington. The subject property,a 12 acre parcel of land, is <br /> zoned R-3,Multiple-Family Medium Density., In order for a daycare facIty to be <br /> constructed,a Special Property Use Permit is required. (finding 1) <br /> 2. A Special Property Use t is rery,Aed for the placement of daycare facilities in the <br /> R-3 zone. (findings 1 &9) <br /> 3. In order for a Special Property Use Permit to be granted withinthe City of Everett,the <br /> General criteria of EMC 19.41.150.0 must be satisfied. Those criteria are iderffied in <br /> findingfact#3. <br /> 4. The criteria of EMC 19.41.150.0 have been addressed in the findings. All of the <br /> criteria are satisfied subject the compliance with conditions as set forth herein. <br /> DECISION <br /> Based upon the preceding Findings of Facts and Conclusions,testimony and evidence <br /> submitted at the public homing} and upon the impression of the Hearing Examines at a site <br /> view, it is hereby ordered that the requested sinislory wood-framed 3,000 square foot <br /> daycare facility with six off-street parking stalls and one cm-site loading space is approved for <br /> the property at 1300-100th Place SE, Everett; Washington. The approval is subject to the <br /> following conditions: <br />
The URL can be used to link to this page
Your browser does not support the video tag.