Laserfiche WebLink
The comments below were generated from this project's City of Everett Civil Reviewers.All questions shall be routed through this project's Public Works <br /> Reviewer Thad Newport with City of Everett Permit Services (TNewport@everettwa.gov). <br /> # Document Sht/Pg Reviewer's Comment Designer's Response Initials <br /> 1 Civil Plans C1.0 See redlines on all sheets indicated on Cover Sheet <br /> Cover Sheet <br /> (1 of 6) <br /> 2 Drainage Section I and Update the parcel address to the correct numbers. <br /> Report IV <br /> The comments below were generated from this project's Stormwater Reviewers. All questions shall be routed through this project's Public Works Reviewer <br /> Thad Newport with City of Everett Permit Services (TNewport@everettwa.gov). <br /> # Document Sht/Pg Reviewer's Comment Designer's Response Initials <br /> 3 Drainage - We no longer follow the 2010 City Stormwater <br /> Report Manual. The requirements for stormwater <br /> management are included in Section 6.10 of the City <br /> Standards and references the most recent Ecology <br /> Stormwater Manual (which is the 2019, not 2014 <br /> manual). The thresholds in the Ecology Manual do <br /> not apply in the Combined Sewer Area, (remove <br /> figure 1)the threshold for flow control is 200 sf <br /> of net new impervious area. Also, MR#5 and MR#6 <br /> are not required in the combined sewer area. <br /> Downstream analysis—normally the existing flow <br /> path would be to flow east into the pipe on Everett <br /> Ave which discharges to the 36" pipe in Broadway, <br /> and during high flows it overflows to the pipe to the <br /> Page 2 of 4 <br />