My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024/03/27 Council Agenda Packet
>
Council Agenda Packets
>
2024
>
2024/03/27 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2024 6:32:29 PM
Creation date
3/27/2024 6:29:10 PM
Metadata
Fields
Template:
Council Agenda Packet
Date
3/27/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett eOM and AM/Maintenance Program Support | Scope of Work <br /> <br /> <br /> 5 <br />Everett eOM and AM_Main Pgm Support SOW <br />Everett Responsibilities <br />• Sharepoint site styling and branding <br />Meetings <br />• Coordination calls, as needed <br />Work Products <br />• Summary comments on review stages <br />Task 204 – Final Testing, Training, and Closeout Documentation <br />Objective: Perform final acceptance testing, facilitate user training, and develop closeout <br />documentation. <br />Activities/Approach: This task includes the following activities: <br />• Perform final testing and review content migration into the eOM SharePoint. Perform user and <br />function testing of each of the core features and navigation. Document all testing actions and <br />results in a testing log. <br />• Facilitate training sessions on eOM SharePoint: <br />o Training session on user access, navigation, and organization structure of information. <br />o Training session on administration, platform maintenance, and editing procedures. <br />• Document the final eOM SharePoint administration, setup, and editing procedures. <br />Task Assumptions <br />• Training sessions will be scheduled for 1 hour and be attended by up to 3 BC Team members. <br />The training sessions will be virtual. <br />Everett Responsibilities <br />• Participate in training sessions <br />Meetings <br />• Training sessions <br />Work Products <br />• User Acceptance Testing log <br />• Training agendas, materials, and recordings of training sessions <br />• Final eOM SharePoint administration memorandum <br /> <br />Phase 300 – O&M Gap Assessment <br />Phase 300 includes an updated WFP O&M information Gap Assessment. <br />Task 301 – WFP O&M Gap Assessment <br />Objective: Update 2021 O&M Manual Support TM and develop action plan to cover gaps. <br />Activities/Approach: This task includes the following activities: <br />• Update BC’s 2021 O&M Manual Support TM (submitted as part of the WFP Facility Plan) based <br />on recent O&M and SOP document updates. As part of the update, identify documents requiring <br />formatting into the City’s standard format.
The URL can be used to link to this page
Your browser does not support the video tag.