My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MacLeod Reckord PLLC 4/4/2024
>
Contracts
>
6 Years Then Destroy
>
2025
>
MacLeod Reckord PLLC 4/4/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2024 2:33:07 PM
Creation date
4/4/2024 2:32:25 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
MacLeod Reckord PLLC
Approval Date
4/4/2024
Council Approval Date
2/28/2024
End Date
6/1/2025
Department
Parks
Department Project Manager
Brad Chenoweth
Subject / Project Title
Landscape Design Services
Tracking Number
0004282
Total Compensation
$176,388.81
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />Forest Park Pickleball Sport Court Improvements Page 3 of 7 <br /> <br />WORK TASKS <br /> <br />TASK 1. PROJECT ADMINISTRATION AND MANAGEMENT <br />1.1 Project Coordination: Coordinate the Consultant design team to ensure that the work <br />is completed on schedule, is technically competent, and meets City's requirements. <br />Develop and implement the work plan and provide overall coordination and review of the <br />work. Distribute project data and organize and administer regular internal coordination <br />meetings of the design team to facilitate execution of the work and respond to requests <br />for information. <br />1.2 Check-In Meetings: Meet with City and their assigns (may include but not be limited to <br />multiple City departments, boards, and council) to discuss and/or present project issues, <br />schedule, progress, and general coordination of effort. <br />1.3 Document Management: Provide for the management of drawings and documents <br />received and generated over the course of the project, including review, distribution, <br />filing and storage. <br />1.4 Project Schedule: Provide a detailed schedule (1 draft, 1 final) for the Consultant work <br />elements, integrating project deliverables and milestones with schedules identified by <br />City. <br />1.5 Subconsultant Management: Subconsultant management includes the preparation <br />and execution of subcontracts with each Subconsultant involved in the project. The <br />Consultant will schedule regular coordination meetings, provide ongoing overview of <br />progress, review of invoices, and overall coordination of Subconsultants involved in the <br />project. <br />1.6 Quality Assurance/Quality Control: Conduct a quality assurance check of all <br />deliverables prior to submittal to the City. <br />1.7 Invoicing: Prepare and submit regular invoicing and monthly progress reports. <br />Assumptions: <br />• Regular check-in meetings will be held remotely, will include team members as <br />appropriate, and will be scheduled approximately twice monthly. <br />Deliverables: <br />• Contract Documents <br />• Project schedule <br />• Monthly Invoicing and Progress Reports <br />• Regular communication, agenda for Check-In Meetings and meeting notes. <br />Meetings: <br />• (18) Check-In Meetings <br /> <br /> <br />TASK 2. SITE RECONAISSANCE <br />2.1. Survey and Mapping: Not Included in this Scope of Work. <br />2.2. Site Reconnaissance and Document Search: Perform site reconnaissance for <br />purposes of reviewing site conditions. Confirm in discussion with the City any operational <br />requirements that will impact site layout. <br />Meetings:
The URL can be used to link to this page
Your browser does not support the video tag.