My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HDR Engineering, Inc. 4/10/2024
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
HDR Engineering, Inc. 4/10/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2025 11:06:21 AM
Creation date
4/17/2024 11:55:16 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
HDR Engineering, Inc.
Approval Date
4/10/2024
Council Approval Date
3/27/2024
End Date
12/31/2025
Department
Public Works
Department Project Manager
Jamielee Graves
Subject / Project Title
2024 Water, Filtration, Sewer, and Stormwater Rate Study
Tracking Number
0004302
Total Compensation
$185,625.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
HDR Engineering, Inc. 11/18/2025 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Exhibit A (Scope of Work) <br />HDR will review and update the City’s miscellaneous charges. These charges were reviewed <br />as a part of the prior comprehensive rate studies and HDR would propose that the same <br />miscellaneous charges be reviewed and updated using a similar approach. Within the Everett <br />Municipal Code, Title 14 Water and Sewer, Chapter 16 Water Rates and Regulations, Section <br />713 Rates and Charges the City has several types of charges listed. These were the charges <br />updated as a part of the City’s prior rate studies conducted by HDR. This review of fees does <br />not include capacity or system development charges or industrial pretreatment charges. <br />Task 7 Assumptions: <br /> Review with City staff the miscellaneous charges to review and update. <br />Task 7 Deliverables: <br /> A draft and final electronic technical memorandum summarizing the review of existing <br />miscellaneous utility charges and updates to be reflective of current costs. <br />Task 8: Rate Study Documentation – Written Report <br />Prepare/submit a study report summarizing assumptions, findings, and study recommendations <br />for each utility. The supporting spreadsheet analyses for each utility will be included as technical <br />appendices. Develop an electronic (PDF) draft final report and incorporate any City comments <br />or corrections into the final electronic (PDF) written report. <br />Task 8 Assumptions: <br /> An electronic draft report will be provided to City staff for review and comments. <br />Task 8 Deliverables: <br /> A final electronic report which includes a technical appendices of the analyses <br />completed. <br />Task 9: Project Meetings and Public Presentations <br />Prepare materials and attend the following meetings to review interim findings, obtain policy <br />direction, and present draft and final study results. In addition to the kick-off meeting and any <br />meetings noted in the prior tasks, the following review meetings and public presentations are <br />anticipated: <br /> Up to eight two-hour virtual project meetings with City staff to review interim findings and <br />receive policy direction. <br /> Up to three two-hour in person project meetings with City staff to review interim findings <br />and receive policy direction. <br /> Up to two meetings with the City Council to assist in presenting the study results and <br />recommendations. <br /> Up to two meetings with other Stakeholder groups as may be requested. <br />Should additional meetings be required, they will be provided on a time and material basis using <br />the current hourly billing rates for the individuals involved. <br />Task 9 Assumptions: <br /> Eight virtual project meetings, three in person project meetings, two City Council <br />meetings, and up to four public meetings/presentations. <br /> Attendance by the HDR Project Manager and/or task lead at all internal project meetings <br />and public presentations. <br />Task 9 Deliverables: <br /> Development of presentation and meeting materials to support HDR’s analyses. <br />Task 10: Ongoing Model Support
The URL can be used to link to this page
Your browser does not support the video tag.