Laserfiche WebLink
Exhibit A (Scope of Work)   <br />Since the development of the initial financial/rate models for the City, HDR has been assisting <br />the City in resolving modeling issues, reviewing City developed analyses, and updating the <br />models to meet the City’s needs. This task will provide up to 80 hours of assistance by a senior <br />financial analyst to assist the City in modeling efforts after the completion of the rate study. This <br />will provide time for rate model assistance for future analyses and scenarios completed by City <br />staff. <br />Task 10 Assumptions: <br />Provide up to 80 hours of ongoing model support. <br />Task 10 Deliverables: <br />Final Excel models. <br />Task 11: Project Management and Quality Control <br />Perform miscellaneous project set up activities, work paper documentation, internal scheduling / <br />workload planning, invoicing, ongoing client correspondence, quality control, and other <br />miscellaneous administrative / project management activities throughout the study. <br />Task 11 Assumptions: <br />Provide quality control through HDR’s QC process on all deliverables provided to the <br />City. <br />Provide overall project administration and management. <br />Task 11 Deliverables: <br />Monthly invoicing and progress report. <br />Project Time Schedule <br />HDR’s estimated project time schedule is, in part, driven by and based on the availability of <br />data, the ability to schedule internal project meetings in a timely manner, and work with City <br />staff to develop the study final recommendations. Based upon our experience working with the <br />City, along with the complexity of these studies, the rate study will be completed by the end of <br />2024. The City is anticipating presenting the results of the study to City management and <br />Council in October 2024, and implementing January of 2025. <br />Project Fee Estimate <br />The estimated project fees were developed based upon the previously discussed scope of work. <br />For each task, the labor hours, by individual, was developed. The total labor hours were then <br />applied to the current hourly billing rates for each individual. For the proposed study, the <br />following hourly billing rates were used to establish the proposed fees for this study. These <br />hourly billing rates will be in effect through December 31, 2024. <br />Individual Project Role Hourly Rate <br />Kevin Lorentzen Project Manager 255.00/hour <br />Shawn Koorn Technical Advisor 325.00/hour <br /> Josiah Close QA/QC 195.00/hour <br />Sara Anderson Financial Analyst 135.00/hour <br />Various Senior Engineering Assistance 290.00/hour <br /> Various Engineering Assistance 180.00/hour