My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HDR Engineering, Inc. 4/10/2024
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
HDR Engineering, Inc. 4/10/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2025 11:06:21 AM
Creation date
4/17/2024 11:55:16 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
HDR Engineering, Inc.
Approval Date
4/10/2024
Council Approval Date
3/27/2024
End Date
12/31/2025
Department
Public Works
Department Project Manager
Jamielee Graves
Subject / Project Title
2024 Water, Filtration, Sewer, and Stormwater Rate Study
Tracking Number
0004302
Total Compensation
$185,625.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
HDR Engineering, Inc. 11/18/2025 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Exhibit A (Scope of Work) <br />Since the development of the initial financial/rate models for the City, HDR has been assisting <br />the City in resolving modeling issues, reviewing City developed analyses, and updating the <br />models to meet the City’s needs. This task will provide up to 80 hours of assistance by a senior <br />financial analyst to assist the City in modeling efforts after the completion of the rate study. This <br />will provide time for rate model assistance for future analyses and scenarios completed by City <br />staff. <br />Task 10 Assumptions: <br />Provide up to 80 hours of ongoing model support. <br />Task 10 Deliverables: <br />Final Excel models. <br />Task 11: Project Management and Quality Control <br />Perform miscellaneous project set up activities, work paper documentation, internal scheduling / <br />workload planning, invoicing, ongoing client correspondence, quality control, and other <br />miscellaneous administrative / project management activities throughout the study. <br />Task 11 Assumptions: <br />Provide quality control through HDR’s QC process on all deliverables provided to the <br />City. <br />Provide overall project administration and management. <br />Task 11 Deliverables: <br />Monthly invoicing and progress report. <br />Project Time Schedule <br />HDR’s estimated project time schedule is, in part, driven by and based on the availability of <br />data, the ability to schedule internal project meetings in a timely manner, and work with City <br />staff to develop the study final recommendations. Based upon our experience working with the <br />City, along with the complexity of these studies, the rate study will be completed by the end of <br />2024. The City is anticipating presenting the results of the study to City management and <br />Council in October 2024, and implementing January of 2025. <br />Project Fee Estimate <br />The estimated project fees were developed based upon the previously discussed scope of work. <br />For each task, the labor hours, by individual, was developed. The total labor hours were then <br />applied to the current hourly billing rates for each individual. For the proposed study, the <br />following hourly billing rates were used to establish the proposed fees for this study. These <br />hourly billing rates will be in effect through December 31, 2024. <br />Individual Project Role Hourly Rate <br />Kevin Lorentzen Project Manager 255.00/hour <br />Shawn Koorn Technical Advisor 325.00/hour <br /> Josiah Close QA/QC 195.00/hour <br />Sara Anderson Financial Analyst 135.00/hour <br />Various Senior Engineering Assistance 290.00/hour <br /> Various Engineering Assistance 180.00/hour
The URL can be used to link to this page
Your browser does not support the video tag.