Laserfiche WebLink
7 8 g LEGEND <br /> REFER TO SHEET EOA FOR SYMBOLS AND ABBREVIATIONS. <br /> I I <br /> ALL SOLENOIDS ON THIS SHEEP ARE CONTROLLED AND <br /> MONITORED BY ALLISON HEAT DETECTION PANEL. <br /> I <br /> 1_1:030 r 1_1:032 r L1:034 r L1:036 P <br /> WF PRESSUREtrW—Fl.,SV45-10 - GENERAL NOTES <br /> P <br /> 3/4"C TO FIRE CANNON 1. ALL SOLENOIDS ON THIS SHEET ARE CONTROLLED <br /> ----TS-V'5 <br /> -4 WF SV45-8 WF PRESSURE PANEL SEE SHEET tE264 AND MONITORED BY ALLISON HEAT DETECTION PANEL. <br /> PRESSURE <br /> SV45-6 WF PRESSURE UV45-2C ALARM IS PSEUDO POINT, SEE POINTS LIST <br /> FA — L1:038 ON SHEET E506-1. <br /> LUNCH ROOM Q� TRBL — L1:039 UV/IR DET #2 ALARM 1_003 <br /> 110 3/4"C 12#14 UV/IR DET #2 TROUBLE L:004 REFERENCE DRAWINGS <br /> tSV45-2 WF PRESSURE 1_1:044 3 E703 SERIES PROCESS AIR PLC/FIRE ALARM <br /> 45-2 WF ISO TAMPER SYSTEM INTERLOCK <br /> (211/2"C, #14 1_1:027 y A <br /> 1_1:028 QPC+Q <br /> CONSTRUCTION NOTES <br /> ROCESS AIR � � ALLISON HEAT 1�PROVIDE NEW FIRE ALARM NAC PANEL TO POWER <br /> SYSTEM OVERRIDE 3/4"C, 2#12 ry 1_1:045 DETECTION PANEL NEW VISUAL (STROBE) NOTIFICATION DEVICES. <br /> FIRE ALARM NAC PANEL© D�:>PROVIDE NEW CONDUCTORS AND RACEWAY FOR <br /> L1:046 NOTIFICATION DEVICES. <br /> I I D:---REPLACE EXISTING STROBE AND HORN WITH NEW <br /> I 3/4"C 16#14 COMBINATION HORN/STROBE TO COMPLY WITH NFPA <br /> UV45-2C STROBE SYNCHRONIZATION REQUIREMENTS. <br /> 1 H/L AIR SPRINKLER ®INTERCEPT CONDUIT, PROVIDE NEW J—BOX, <br /> 1/2"C, 4#14 ROOM DISCONNECT STROBE FROM PREVIOUS CIRCUIT AND <br /> Ll:04 0 C� PULL NEW 4#14 WIRES FOR THE NEW FIRE ALARM <br /> STROBE CIRCUIT. IF AT ALL PRACTICABLE AT THE <br /> CONTRACTOR'S OPTION, RE—USE EXISTING <br /> CONDUCTORS SUBJECT TO VERIFICATION WITH FIRE <br /> ALARM CONTRACTOR. <br /> 2 <br /> A INTERCEPT STROBE CIRCUIT CONDUCTORS FOR THE <br /> STROBE DEVICE DOWNSTREAM AND REUSE TO <br /> CORRIDOR EXTEND NEW STROBE CIRCUIT TO NEW DEVICES IN <br /> F-1 04 �3/4"C #14 THE HANGAR. <br /> ©PROVIDE (2) NAC PANELS, (1) FOR THE NEW <br /> SYNCHRONIZED HORN STROBE AND (1) FOR THE <br /> MECHANICAL CLASS 1, DIV 1 HORNS AND STROBES. <br /> ROOM WEST <br /> 3/4"C, 3-16/4C M 1 1/4"C, 44#14 TO ATTICPROVIDE NEW SMOKE DETECTOR. CONNECT TO <br /> EXISTING ALLISON HEAT DETECTION PANEL. <br /> 1/2"C, 4#12 <br /> 0.4 1 3 5 7 9 11 13 15 <br /> A <br /> I C <br /> 1"C, #14, 6#12 1E26 / tE261 E <br /> 16X16 FATC r -1 I G <br /> 12 MODULES <br /> 3/4" 16/2C SLC1E262A E262 *E263 <br /> _, i—�\_j J <br /> �\ I K <br /> E26 41 1E26 M <br /> �\ 4#14 S.L. TO WEST <br /> I PULL STATIONS P <br /> ` \ R <br /> ■ / * DENOTES DRAWING NOT INCLUDED IN THIS SET. <br /> //( KEY PLAN BLDG. 45-01 f <br /> . SCALE: NONE <br /> MECHANICAL ROOM WEST - ENLARGED PLAN 81 <br /> ' 4' D 4' 6' 16' <br /> SCALE: 1/2"=1'-0" E506-2 <br /> O� SCALE: 1/8"=1'-0" <br /> DRAWN SUBTITLE CURRENT REVISION SYMBOL DATE <br /> SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE ACCEPTABILITY zo12.04.19 MECHANICAL ROOM WEST-ENLARGED PLAN D 04.14.21 <br /> CHECKED <br /> _ A EVERETT FIRE PANEL REPLACEMENT W2640474 SAZAN/ZO 12.04.19 m THIS DESIGN AND/OR ZO 12.04.19 SHEET <br /> �/ THIS <br /> IS APPROVED <br /> 8 SHOP DRAWINGS LE <br /> AGOW/HG 04.10.20 //� BOE,N �.® APPROVED BY DEPT. DATE CK 12.04.19 ENGINEER n NAC MODIFICATION CHECKED E506-2 <br /> C AS BUILTS AGOW/HG 08.21.20 �`y//J`J�` Pete Linamen CK 12.04.19 BUILDING 45-001 <br /> JOB NO. COMP N0. <br /> APPROVED <br /> D NAC MODIFICATION AGOW/HG 04.14.21 <br /> APPROVED ELECTRICAL MASTER COL. A—G 1-9 EVERETT, WA. DWG NG 40-051—E506-2 <br />