Laserfiche WebLink
Terra Vista NW i i, Stormwater Management Report <br /> Minimum Stormwater Management Requirements <br /> Overview of Minimum Requirements <br /> Minimum requirements 1-5 shall apply to the project. <br /> Start Here <br /> J <br /> Does the Site have 35% YesSee Redevelopment Project <br /> r more of existing hard Thresholds and the Figure "Flow <br /> osurface coverage? Chart for Determining <br /> Requirements for Redevelopment". <br /> No <br /> Does the Project convert 3/ <br /> acres or more of vegetation to <br /> Does the Project result i lawn or landscaped areas,or <br /> 5,000 square feet,or No convert 2.5 acres or more of <br /> greater,of new plus ► native vegetation to pasture? <br /> replaced hard surface <br /> area? <br /> k No <br /> Yes <br /> Yes Does the Project result in 2,000 <br /> V square feet,or greater,of new plus <br /> All Minimum Requirements replaced hard surface area? <br /> apply to the new and replaced <br /> hard surfaces and converted No <br /> vegetation areas. <br /> V <br /> Does the Project have land <br /> Minimum Requirements#1 disturbing activities of 7,000 <br /> through#5 apply to the new Yes <br /> square feet or greater? <br /> and replaced hard surfaces <br /> and the land disturbed. No <br /> V <br /> Minimum Requirement#2 <br /> applies. <br /> Flow Chart for Determining Requirements for <br /> New Development <br /> DEPARTMENT OF Revised March 2019 <br /> ECOLOGY Please see http://www.ecy.wa.gov/copyright.html for copyright notice including permissions, <br /> State of Washington limitation of liability,end disclaimer. <br /> (210314)4900-4 Everett Page 4 June 1,2021 <br />