Page 97 of4/19/2024 12:03 PMEverett WFPDB GMP WIP4211GMPWIP 110
<br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit
<br />6,595.24403.00000.333315.0000426.19110.033330.000012,785.7320
<br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours
<br />6,985.5060122.197390.00000.0111450.0000
<br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar:
<br />2.00Equipment Pcs:3.00Labor Pcs:150.00Crew Hrs:100.00Eff:30HUProd:(Mod) Mechanical Crew - 3 MenMC3Crew:
<br />Price includes 5 new 30" PEXFLXFL T's
<br />5 ea. 30" valves
<br />5 ea. blind flanges
<br />Relocating existing actuators to new vavles
<br />CMA - Coating repairs (inside and out of filter header)
<br /> - Actuator Modifications / adapter plates
<br />Removing all of the above, install BF's
<br />Notes:
<br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource
<br />10,000.001.00100.001.00DOL10,000.001.00Perm Matl Allowance2CMA
<br />25,000.005,000.00100.005,000.00EA5.001.00SUB - Pipe Welding4WELD
<br />4,166.4827.78109.7526.38HR150.001.00Genie 842 Forklift 8K 42'8FL08
<br />4,773.4131.82109.7530.68HR150.001.00Ford F450 Pipefitter8TKJ450P
<br />18,661.79124.41110.0071.89MH150.001.00Pipefitter ForemanPFF
<br />36,326.98121.09110.0069.89MH300.002.00Pipefitter JourneymanPFJ
<br />EAUnit:1.00Quantity:FWPS Temp Mech720-10Activity:
<br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor
<br />34,833.380.000.000.000.005,000.004,171.9525,661.439,361.9116,299.52Total
<br />34,833.380.000.000.000.005,000.004,171.9525,661.439,361.9116,299.52U. Cost
<br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit
<br />4,976.19717.00000.14297.0000426.19110.014370.000029,833.3800
<br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours
<br />16,299.5200122.1973210.00000.0048210.0000
<br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar:
<br />2.00Equipment Pcs:3.00Labor Pcs:70.00Crew Hrs:100.00Eff:70HUProd:(Mod) Mechanical Crew - 3 MenMC3Crew:
<br />Isolate pumps 10 and 11, disconnect from existing header (blind flange @ floor), Connect new header and check valves to
<br />existing pumps.
<br />CMA - Flanges on Floor, Temporary gaskets, bracing, etc.
<br />Remove and reinstall to exisitng condition.
<br />Notes:
<br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource
<br />5,000.001.00100.001.00DOL5,000.001.00Perm Matl Allowance2CMA
<br />1,944.3627.78109.7526.38HR70.001.00Genie 842 Forklift 8K 42'8FL08
<br />2,227.5931.82109.7530.68HR70.001.00Ford F450 Pipefitter8TKJ450P
<br />8,708.84124.41110.0071.89MH70.001.00Pipefitter ForemanPFF
<br />16,952.59121.09110.0069.89MH140.002.00Pipefitter JourneymanPFJ
<br />EAUnit:1.00Quantity:West Clearwell Wall Penetration - civil720-20Activity:
<br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor
<br />11,391.090.000.000.000.000.003,372.998,018.102,972.795,045.31Total
<br />11,391.090.000.000.000.000.003,372.998,018.102,972.795,045.31U. Cost
<br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit
<br />5,695.54502.00000.50002.0000569.55450.050020.000011,391.0900
<br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours
<br />5,045.3100100.226380.00000.012580.0000
<br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar:
<br />7.00Equipment Pcs:4.00Labor Pcs:20.00Crew Hrs:100.00Eff:20CHProd:(Mod) Pipe X200/4 MenPC2004Crew:
|