Laserfiche WebLink
Page 98 of4/19/2024 12:03 PMEverett WFPDB GMP WIP4211GMPWIP 110 <br />1 day to excavate and stabilize <br />1 day to backfill and restoreNotes: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />370.4118.52109.7516.88HR20.001.00Hoe Pack Excavator Mount8CMHP <br />2,508.70125.44109.75115.48HR20.001.00JD 200 Excavator 20MT8EX200 <br />219.502.74109.752.50HR80.004.00Road Plate8SHRP <br />274.3813.72109.7512.50HR20.001.00Trench Box 8'H8SHT <br />1,723.0586.15110.0048.86MH20.001.00Laborer ForemanLF <br />1,656.6182.83110.0046.86MH20.001.00Laborer - General G3/4LG <br />2,276.27113.81110.0065.51MH20.001.00Oper Ldr<6 CY/Ex->30MT G2O2 <br />2,362.17118.11110.0068.10MH20.001.00Operator ForemanOF <br />EAUnit:1.00Quantity:West Clearwell Wall Pen - Carpentry720-21Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />21,860.790.000.000.003,255.005,000.001,111.0612,494.734,617.117,877.62Total <br />21,860.790.000.000.003,255.005,000.001,111.0612,494.734,617.117,877.62U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />5,465.19754.00000.25004.0000340.14480.025040.000013,605.7900 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />7,877.6200104.1228120.00000.0083120.0000 <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />1.00Equipment Pcs:3.00Labor Pcs:40.00Crew Hrs:100.00Eff:40CHProd:(Mod) Carpenter Crew - 3 ManC3Crew: <br />Permanent allowance includes: <br />Rebar Dowels, Concrete pourback <br />Consumable Allowance includes <br />Formwork, Scaffolding (interior) <br />Notes: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />5,000.001.00100.001.00DOL5,000.001.00Perm Matl Allowance2CMA <br />3,255.001.09108.501.00DOL3,000.001.00Consumable Matl Allowance3CMA <br />1,111.0627.78109.7526.38HR40.001.00Genie 842 Forklift 8K 42'8FL08 <br />4,253.50106.34110.0061.01MH40.001.00Carpenter ForemanCF <br />8,241.23103.02110.0059.01MH80.002.00Carpenter JourneymanCJ <br />LFUnit:500.00Quantity:Remove 30" bypass720-30Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />4,814.800.000.000.000.000.00817.513,997.291,482.432,514.86Total <br />9.630.000.000.000.000.001.647.992.965.03U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />4,814.80000.0020500.00001.0000481.480050.00000.02009.6296 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />5.029799.93230.080012.500040.0000 <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />2.00Equipment Pcs:4.00Labor Pcs:10.00Crew Hrs:100.00Eff:0.02HUProd:(Mod) Utility Crew X135T/3 MenPCUX3Crew: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />539.7453.97109.7549.58HR10.001.00Takeuchi 135 Excvatr 3.5MT8EX135T <br />277.7727.78109.7526.38HR10.001.00Genie 842 Forklift 8K 42'8FL08 <br />1,656.6182.83110.0046.86MH20.002.00Laborer - General G3/4LG <br />1,129.78112.98110.0065.01MH10.001.00Oper Dzr->D9/Ex->15MT G3O3 <br />1,210.90121.09110.0069.89MH10.001.00Pipefitter JourneymanPFJ <br />LSUnit:1.00Quantity:Reconfig BWPS720-31Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor