Laserfiche WebLink
Page 9 of4/19/2024 12:03 PMEverett WFPDB GMP WIP4211GMPWIP 110 <br />LSUnit:1.00Quantity:Raise Iron397-00Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />6,826.130.000.000.000.003,500.00539.742,786.391,040.361,746.03Total <br />6,826.130.000.000.000.003,500.00539.742,786.391,040.361,746.03U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />6,826.13001.00001.00001.0000332.61300.100010.00003,326.1300 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />1,746.030092.879730.00000.033330.0000 <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />1.00Equipment Pcs:3.00Labor Pcs:10.00Crew Hrs:100.00Eff:10HUProd:Utility Crew X135T/3 MenPCUX3Crew: <br />CMA = <br />Frame and Grates, Valve Cans, Lid Allowance, etc.Notes: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />3,500.001.00100.001.00DOL3,500.001.00Perm Matl Allowance2CMA <br />539.7453.97109.7549.58HR10.001.00Takeuchi 135 Excvatr 3.5MT8EX135T <br />1,656.6182.83110.0046.86MH20.002.00Laborer - General G3/4LG <br />1,129.78112.98110.0065.01MH10.001.00Oper Dzr->D9/Ex->15MT G3O3 <br />EAUnit:8.00Quantity:Utilities - Cap / Abandon in place660-35Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />28,655.310.000.000.000.000.003,270.0325,385.289,367.9016,017.38Total <br />3,581.910.000.000.000.000.00408.753,173.161,170.992,002.17U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />7,163.82750.50002.00004.0000716.38280.20005.00003,581.9138 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />2,002.1725105.772030.00000.0333240.0000 <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />2.00Equipment Pcs:6.00Labor Pcs:40.00Crew Hrs:100.00Eff:5HUProd:(Mod) Pipe FL/3 MenPCF3Crew: <br />Misc utility - locate, troubleshoot, abandon, cap, thrust blocks, grout plugs, etc.Notes: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />2,158.9753.97109.7549.58HR40.001.00Takeuchi 135 Excvatr 3.5MT8EX135T <br />1,111.0627.78109.7526.38HR40.001.00Genie 842 Forklift 8K 42'8FL08 <br />6,626.4482.83110.0046.86MH80.002.00Laborer - General G3/4LG <br />4,552.55113.81110.0065.51MH40.001.00Oper Ldr<6 CY/Ex->30MT G2O2 <br />4,519.10112.98110.0065.01MH40.001.00Oper Dzr->D9/Ex->15MT G3O3 <br />9,687.19121.09110.0069.89MH80.002.00Pipefitter JourneymanPFJ <br />LSUnit:1.00Quantity:Elect Sub Support750-02Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />25,709.870.000.0010,000.000.000.003,756.9311,952.944,434.127,518.82Total <br />25,709.870.000.0010,000.000.000.003,756.9311,952.944,434.127,518.82U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />6,427.46754.00000.25004.0000392.74680.025040.000015,709.8700 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />7,518.820099.6078120.00000.0083120.0000 <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />2.00Equipment Pcs:3.00Labor Pcs:40.00Crew Hrs:100.00Eff:40HUProd:(Mod) Carpenter Crew - 1 ManC1Crew: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource