Laserfiche WebLink
Page 109 of4/19/2024 12:03 PMEverett WFPDB GMP WIP4211GMPWIP 110 <br />LS1.00033000Takeoff Qty: <br />Bid Qty: <br />ENGINEERING CONSTRUCTION SUPPORTBiditem <br />1.000 LS <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />889,223.030.0025,600.00863,623.030.000.000.000.000.000.00Total <br />889,223.030.0025,600.00863,623.030.000.000.000.000.000.00U. Cost <br />LSUnit:1.00Quantity:PI Construction Support020-60Activity: <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />25,600.0040.00100.0040.00HR640.001.00Engineering - Philippines91911 <br />LSUnit:1.00Quantity:Eng Construction Support020-70Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />863,623.030.000.00863,623.030.000.000.000.000.000.00Total <br />863,623.030.000.00863,623.030.000.000.000.000.000.00U. Cost <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />144,383.66144,383.66100.00144,383.66LS1.001.00Geoengineeers4GEOENG <br />719,239.37719,239.37100.00719,239.37LS1.001.00KJ Engineering4KJENG <br />LS1.00034000Takeoff Qty: <br />Bid Qty: <br />GENERAL CONDITIONS FEEBiditem <br />1.000 LS <br />LSUnit:1.00Quantity:General Conditions Fee001-00Activity: <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />1,750,000.001,750,000.00100.001,750,000.00LS1.001.00General Conditions91100 <br />LS1.00035000Takeoff Qty: <br />Bid Qty: <br />PASS THRU COSTBiditem <br />1.000 LS <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />1,249,582.790.001,249,582.790.000.000.000.000.000.000.00Total <br />1,249,582.790.001,249,582.790.000.000.000.000.000.000.00U. Cost <br />LSUnit:1.00Quantity:Permits/Licenses022-10Activity: <br />WA Road ConstructionWA0101WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />0.000.00100.001.00EA0.001.00Building Permits92104 <br />LSUnit:1.00Quantity:Performance Bond022-30Activity: <br />WA Road ConstructionWA0101WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />303,898.95303,898.95100.00303,898.95LS1.001.00Performance Bond92115