My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO Construction 5/1/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO Construction 5/1/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2024 3:02:12 PM
Creation date
5/1/2024 1:07:33 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO Construction
Approval Date
5/1/2024
End Date
4/30/2026
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
Capital Improvements at the Water Filtration Plant
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0003343
Total Compensation
$26,270,329.25
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2611
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Page 15 of4/19/2024 12:03 PMEverett WFPDB GMP WIP4211GMPWIP 110 <br />0.007798.547462.8661208.8039260.00000.0038260.0000 <br />EAUnit:20.00Quantity:Pothole - Backhoe065-10Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />15,806.540.000.000.000.000.006,271.749,534.803,381.956,152.85Total <br />790.330.000.000.000.000.00313.59476.74169.10307.64U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />3,161.30800.25004.00005.0000316.13080.40002.5000790.3270 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />307.642595.34805.00000.2000100.0000 <br />WA Road ConstructionWA0101WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />1.00Equipment Pcs:2.00Labor Pcs:50.00Crew Hrs:100.00Eff:5MUProd:(Mod) Labor X160/3 MenLX3Crew: <br />Pothole backhoe to excavate overburden and get close to utilities <br />Pothole Vactor to get from open cut areas to and past utilities <br />High voltage electrical <br />Telemetry / Fiberoptics <br />Chemicals <br />Utilities <br />Must treat all abandoned utilities as live until determined otherwise. <br />Notes: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />6,271.74125.43109.75115.48HR50.001.00JD 200 Excavator 20MT8EX200 <br />4,013.7280.27110.0046.86MH50.001.00Laborer - General G3/4LG <br />5,521.08110.42110.0065.01MH50.001.00Oper Dzr->D9/Ex->15MT G3O3 <br />EAUnit:20.00Quantity:Pothole - Vactor Truck065-20Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />13,810.980.000.0010,600.000.000.000.003,210.981,149.142,061.84Total <br />690.550.000.00530.000.000.000.00160.5557.46103.09U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />3,452.74500.20005.00004.000080.27450.50002.0000160.5490 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />103.092080.27452.00000.500040.0000 <br />WA Road ConstructionWA0101WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />0.00Equipment Pcs:1.00Labor Pcs:40.00Crew Hrs:100.00Eff:2HUProd:(Mod) Labor Crew - 2 MenL2Crew: <br />Pothole backhoe to excavate overburden and get close to utilities <br />Pothole Vactor to get from open cut areas to and past utilities <br />High voltage electrical <br />Telemetry / Fiberoptics <br />Chemicals <br />Utilities <br />Must treat all abandoned utilities as live until determined otherwise. <br />Notes: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />10,600.00265.00100.00265.00HR40.001.00Vacuum Truck Sub4VT <br />3,210.9880.27110.0046.86MH40.001.00Laborer - General G3/4LG <br />LSUnit:1.00Quantity:Relocate Utilities695-00Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />24,671.500.000.000.000.005,666.506,128.4512,876.554,746.068,130.49Total <br />24,671.500.000.000.000.005,666.506,128.4512,876.554,746.068,130.49U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />6,167.87504.00000.25004.0000475.12500.025040.000019,005.0000 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />8,130.4900107.3046120.00000.0083120.0000
The URL can be used to link to this page
Your browser does not support the video tag.