Laserfiche WebLink
Page 16 of4/19/2024 12:03 PMEverett WFPDB GMP WIP4211GMPWIP 110 <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />2.00Equipment Pcs:3.00Labor Pcs:40.00Crew Hrs:100.00Eff:40HUProd:(Mod) Excav X200/2 MenE202Crew: <br />Assume: <br />3 ea. chlorine lines - PVC Sch 80 <br />Power and Fiber - Portal 4 <br />Power and Fiber - Chlorine Building <br />Water? <br />Misc. <br />Notes: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />1,166.5023.33100.0023.33TON50.001.00LAKESIDE - Gvl BF Pipe Zone <br />Bed FOB Job2AJGPZ <br />3,000.001,500.00100.001,500.00EA2.001.00Precast Vaults2PCVAULT <br />1,500.002.50100.002.50LF600.001.003" PVC Pipe2PIPV03 <br />5,017.39125.43109.75115.48HR40.001.00JD 200 Excavator 20MT8EX200 <br />1,111.0627.78109.7526.38HR40.001.00Genie 842 Forklift 8K 42'8FL08 <br />3,480.4087.01110.0049.38MH40.001.00Laborer - Grade Checker G4LGC <br />4,552.55113.81110.0065.51MH40.001.00Oper Ldr<6 CY/Ex->30MT G2O2 <br />4,843.60121.09110.0069.89MH40.001.00Pipefitter JourneymanPFJ <br />LS1.00013060Takeoff Qty: <br />Bid Qty: <br />OPEN SITEBiditem <br />1.000 LS <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />46,723.110.000.000.000.000.0021,621.2825,101.838,865.9216,235.91Total <br />46,723.110.000.000.000.000.0021,621.2825,101.838,865.9216,235.91U. Cost <br />Unit/CHTotal Labor/MHBase Labor/MH$/MHMH/UnitUnit/MHManhours <br />0.0167104.591067.6496194.6796240.00000.0042240.0000 <br />TCYUnit:1200.00Quantity:Struct Exc-Exc->Embnk/Stockpile215-05Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />46,723.110.000.000.000.000.0021,621.2825,101.838,865.9216,235.91Total <br />38.940.000.000.000.000.0018.0220.927.3913.53U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />7,787.18500.0050200.00006.0000778.718520.00000.050038.9359 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />13.5299104.59100.20005.0000240.0000 <br />WA Road ConstructionWA0101WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />3.00Equipment Pcs:4.00Labor Pcs:60.00Crew Hrs:100.00Eff:20UHProd:(Mod) Excav X330/2 MenE332Crew: <br />Excavate area to approximate 4' cut to have working shelf for relocating utilities and securing <br />20 TCY / CH <br />Excavate and push up <br />Notes: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />3,584.3559.74109.7555.22HR60.001.00Cat D5 Komatsu GPS IMCO8DZ5 <br />7,526.09125.43109.75115.48HR60.001.00JD 200 Excavator 20MT8EX200 <br />10,510.84175.18109.75161.48HR60.001.00JD 330 Excavator 33MT8EX330 <br />5,067.2584.45110.0049.38MH60.001.00Laborer - Grade Checker G4LGC <br />6,733.82112.23110.0066.10MH60.001.00Oper Ldr->8 CY/Ex->50MT G1O1 <br />6,675.46111.26110.0065.51MH60.001.00Oper Ldr<6 CY/Ex->30MT G2O2 <br />6,625.30110.42110.0065.01MH60.001.00Oper Dzr->D9/Ex->15MT G3O3 <br />MASS EXCAVATIONBiditem