My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO Construction 5/1/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO Construction 5/1/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2024 3:02:12 PM
Creation date
5/1/2024 1:07:33 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO Construction
Approval Date
5/1/2024
End Date
4/30/2026
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
Capital Improvements at the Water Filtration Plant
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0003343
Total Compensation
$26,270,329.25
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2611
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Page 17 of4/19/2024 12:03 PMEverett WFPDB GMP WIP4211GMPWIP 110 <br />LS1.00013070Takeoff Qty: <br />Bid Qty:1.000 LS <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />31,849.960.000.000.000.000.0016,633.0315,216.935,374.119,842.82Total <br />31,849.960.000.000.000.000.0016,633.0315,216.935,374.119,842.82U. Cost <br />Unit/CHTotal Labor/MHBase Labor/MH$/MHMH/UnitUnit/MHManhours <br />0.0275104.799867.7880219.3523145.20000.0069145.2000 <br />TCYUnit:1452.00Quantity:Struct Exc-Exc->Embnk/Stockpile215-05Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />31,849.960.000.000.000.000.0016,633.0315,216.935,374.119,842.82Total <br />21.940.000.000.000.000.0011.4610.483.706.78U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />8,774.09370.0025400.00003.6300877.409440.00000.025021.9352 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />6.7788104.79980.100010.0000145.2000 <br />WA Road ConstructionWA0101WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />4.00Equipment Pcs:4.00Labor Pcs:36.30Crew Hrs:100.00Eff:40UHProd:(Mod) Excav X330/2 MenE332Crew: <br />Mass excavation - Quicker production - assume past shallow utilities, but need to start setting boxes <br />40 TCY / CH <br />Excavate and push up <br />Notes: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />2,168.5359.74109.7555.22HR36.301.00Cat D5 Komatsu GPS IMCO8DZ5 <br />4,553.28125.43109.75115.48HR36.301.00JD 200 Excavator 20MT8EX200 <br />6,359.06175.18109.75161.48HR36.301.00JD 330 Excavator 33MT8EX330 <br />3,552.1697.86109.7590.74HR36.301.00JD 644 Loader 4.5 CY8LD644 <br />3,065.6884.45110.0049.38MH36.301.00Laborer - Grade Checker G4LGC <br />4,073.96112.23110.0066.10MH36.301.00Oper Ldr->8 CY/Ex->50MT G1O1 <br />8,077.29111.26110.0065.51MH72.602.00Oper Ldr<6 CY/Ex->30MT G2O2 <br />LS1.00013080Takeoff Qty: <br />Bid Qty: <br />DENTAL EXCAVATIONBiditem <br />1.000 LS <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />40,849.260.000.005,300.000.000.0015,469.9920,079.277,104.9212,974.35Total <br />40,849.260.000.005,300.000.000.0015,469.9920,079.277,104.9212,974.35U. Cost <br />Unit/CHTotal Labor/MHBase Labor/MH$/MHMH/UnitUnit/MHManhours <br />0.0250100.396464.8718204.2463200.00000.0050200.0000 <br />TCYUnit:400.00Quantity:Struct Exc-Exc->Embnk/Stockpile215-05Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />40,849.260.000.005,300.000.000.0015,469.9920,079.277,104.9212,974.35Total <br />102.120.000.0013.250.000.0038.6750.2017.7632.44U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />10,212.31500.0100100.00004.0000888.731510.00000.100088.8732 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />32.4359100.39640.50002.0000200.0000 <br />WA Road ConstructionWA0101WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar:
The URL can be used to link to this page
Your browser does not support the video tag.