Page 18 of4/19/2024 12:03 PMEverett WFPDB GMP WIP4211GMPWIP 110
<br />4.00Equipment Pcs:5.00Labor Pcs:40.00Crew Hrs:100.00Eff:10UHProd:(Mod) Excav X330/2 MenE332Crew:
<br />Excavate around and under large utilities - slow down production again
<br />10 TCY / CH
<br />Excavate and push up
<br />Notes:
<br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource
<br />5,300.00265.00100.00265.00HR20.001.00Vacuum Truck Sub4VT
<br />2,389.5759.74109.7555.22HR40.001.00Cat D5 Komatsu GPS IMCO8DZ5
<br />2,158.9753.97109.7549.58HR40.001.00Takeuchi 135 Excvatr 3.5MT8EX135T
<br />7,007.23175.18109.75161.48HR40.001.00JD 330 Excavator 33MT8EX330
<br />3,914.2297.86109.7590.74HR40.001.00JD 644 Loader 4.5 CY8LD644
<br />6,756.3284.45110.0049.38MH80.002.00Laborer - Grade Checker G4LGC
<br />4,489.22112.23110.0066.10MH40.001.00Oper Ldr->8 CY/Ex->50MT G1O1
<br />8,833.73110.42110.0065.01MH80.002.00Oper Dzr->D9/Ex->15MT G3O3
<br />LS1.00013090Takeoff Qty:
<br />Bid Qty:
<br />EX SUPPORT / MISCBiditem
<br />1.000 LS
<br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor
<br />26,060.370.000.000.007,052.503,021.206,146.319,840.363,647.826,192.54Total
<br />26,060.370.000.000.007,052.503,021.206,146.319,840.363,647.826,192.54U. Cost
<br />Unit/CHTotal Labor/MHBase Labor/MH$/MHMH/UnitUnit/MHManhours
<br />0.0204100.411863.1892265.922198.00000.010298.0000
<br />EAUnit:4.00Quantity:Local Dewatering / Sumping296-02Activity:
<br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor
<br />8,152.670.000.000.001,627.500.002,508.704,016.471,488.902,527.57Total
<br />2,038.170.000.000.00406.880.00627.181,004.12372.23631.89U. Cost
<br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit
<br />4,076.33500.50002.00002.0000326.25850.20005.00001,631.2925
<br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours
<br />631.8925100.411810.00000.100040.0000
<br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar:
<br />1.00Equipment Pcs:2.00Labor Pcs:20.00Crew Hrs:100.00Eff:5HUProd:Excav X200/2 MenE202Crew:
<br />CMA for sumps, pumps, hoses, discharge piping, etc.Notes:
<br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource
<br />1,627.501.09108.501.00DOL1,500.001.00Consumable Matl Allowance3CMA
<br />2,508.70125.44109.75115.48HR20.001.00JD 200 Excavator 20MT8EX200
<br />1,740.2087.01110.0049.38MH20.001.00Laborer - Grade Checker G4LGC
<br />2,276.27113.81110.0065.51MH20.001.00Oper Ldr<6 CY/Ex->30MT G2O2
<br />LSUnit:1.00Quantity:Temporary Pipe Support296-04Activity:
<br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor
<br />11,950.170.000.000.005,425.000.002,508.704,016.471,488.902,527.57Total
<br />11,950.170.000.000.005,425.000.002,508.704,016.471,488.902,527.57U. Cost
<br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit
<br />5,975.08502.00000.50002.0000326.25850.050020.00006,525.1700
<br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours
<br />2,527.5700100.411840.00000.025040.0000
<br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar:
|