Laserfiche WebLink
Page 19 of4/19/2024 12:03 PMEverett WFPDB GMP WIP4211GMPWIP 110 <br />1.00Equipment Pcs:2.00Labor Pcs:20.00Crew Hrs:100.00Eff:20HUProd:Excav X200/2 MenE202Crew: <br />Assumption: <br />Ecology Blocks, Wedges / blocking, metal strapping, etc. <br />UPDATE - Reduced scope due to limited span - still some will be required <br />Notes: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />5,425.001.09108.501.00DOL5,000.001.00Consumable Matl Allowance3CMA <br />2,508.70125.44109.75115.48HR20.001.00JD 200 Excavator 20MT8EX200 <br />1,740.2087.01110.0049.38MH20.001.00Laborer - Grade Checker G4LGC <br />2,276.27113.81110.0065.51MH20.001.00Oper Ldr<6 CY/Ex->30MT G2O2 <br />TNUnit:60.00Quantity:Subgrade Stabilization296-06Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />3,066.770.000.000.000.002,088.00376.30602.47223.34379.13Total <br />51.110.000.000.000.0034.806.2710.043.726.32U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />10,222.56670.0050200.00000.3000326.256720.00000.050016.3128 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />6.3188100.41170.100010.00006.0000 <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />1.00Equipment Pcs:2.00Labor Pcs:3.00Crew Hrs:100.00Eff:20UHProd:Excav X200/2 MenE202Crew: <br />Work area under and around pipesNotes: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />2,088.0034.80100.0034.80TON60.001.00HEIDLBRGMAT - Quarry Spalls <br />FOB Job2AJSRS <br />376.30125.43109.75115.48HR3.001.00JD 200 Excavator 20MT8EX200 <br />261.0387.01110.0049.38MH3.001.00Laborer - Grade Checker G4LGC <br />341.44113.81110.0065.51MH3.001.00Oper Ldr<6 CY/Ex->30MT G2O2 <br />TNUnit:40.00Quantity:Fine Grading296-08Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />2,890.760.000.000.000.00933.20752.611,204.95446.68758.27Total <br />72.270.000.000.000.0023.3318.8230.1211.1718.96U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />4,817.93330.015066.66670.6000326.26006.66670.150048.9390 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />18.9568100.41250.30003.333312.0000 <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />1.00Equipment Pcs:2.00Labor Pcs:6.00Crew Hrs:100.00Eff:6.6667UHProd:Excav X200/2 MenE202Crew: <br />Level work areas for ladders / scaffolding - welding and fitting supportNotes: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />933.2023.33100.0023.33TON40.001.00LAKESIDE - Cr Surf Top Course <br />FOB Job2AJCSTC <br />752.61125.44109.75115.48HR6.001.00JD 200 Excavator 20MT8EX200 <br />522.0687.01110.0049.38MH6.001.00Laborer - Grade Checker G4LGC <br />682.89113.82110.0065.51MH6.001.00Oper Ldr<6 CY/Ex->30MT G2O2 <br />LS1.00013120Takeoff Qty: <br />Bid Qty: <br />BACKFILL AND RESTORATIONBiditem <br />1.000 LS