Laserfiche WebLink
Page 20 of4/19/2024 12:03 PMEverett WFPDB GMP WIP4211GMPWIP 110 <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />106,572.630.000.000.000.0044,270.0030,542.3931,760.2411,244.4620,515.78Total <br />106,572.630.000.000.000.0044,270.0030,542.3931,760.2411,244.4620,515.78U. Cost <br />Unit/CHTotal Labor/MHBase Labor/MH$/MHMH/UnitUnit/MHManhours <br />0.007399.173364.0618332.7795320.25000.0031320.2500 <br />TONUnit:3660.00Quantity:Grav Borrow - Purch FOB Job231-15Activity: <br />WA Road ConstructionWA0101WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />Cut proposed volume into 1/2 purchase import - assuming 1/2 native - waste remaing native onsiteNotes: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />34,770.0019.00100.0019.00TON1,830.000.50GIRARD - Gravel Borrow FOB <br />Job2AJBGB <br />TNUnit:500.00Quantity:Pipe Bedding - Purch FOB Job231-16Activity: <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />0.00000.00000.00000.00000.00000.00000.00000.0000 <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />0.00Equipment Pcs:0.00Labor Pcs:0.00Crew Hrs:100.00Eff:0Prod:*** BACKFILL CREWS ***BFCrew: <br />Plug for Pipe Zone Bedding - Hauling (if needed) and Placing will be with Grav Borrow Haul / Embank items - Intended to cover <br />material price differenceNotes: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />9,500.0019.00100.0019.00TON500.001.00GIRARD - Bk Run Gvl Trnch Drn <br />FOB Job2AJGBR <br />TONUnit:1830.00Quantity:Grav Borrow - Haul Native231-25Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />10,882.510.000.000.000.000.007,209.953,672.561,314.332,358.23Total <br />5.950.000.000.000.000.003.942.010.721.29U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />2,378.69070.0025400.00004.5750237.869140.00000.02505.9467 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />1.288780.27450.025040.000045.7500 <br />WA Road ConstructionWA0101WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />2.00Equipment Pcs:1.00Labor Pcs:45.75Crew Hrs:100.00Eff:40UHProd:(Mod) Excav L644/2 MenEL642Crew: <br />Assuming over 50% is onsite haul from stockpile location <br />Assume stockpile close - dozer pushes to loader to transport <br />Notes: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />2,733.0659.74109.7555.22HR45.751.00Cat D5 Komatsu GPS IMCO8DZ5 <br />4,476.8997.86109.7590.74HR45.751.00JD 644 Loader 4.5 CY8LD644 <br />3,672.5680.27110.0046.86MH45.751.00Laborer - General G3/4LG <br />TONUnit:3660.00Quantity:Grav Borrow - Embank231-30Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />51,420.120.000.000.000.000.0023,332.4428,087.689,930.1318,157.55Total <br />14.050.000.000.000.000.006.377.672.714.96U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />5,619.68520.0025400.00009.1500561.968540.00000.025014.0492 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />4.9611102.32310.075013.3333274.5000 <br />WA Road ConstructionWA0101WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: