Laserfiche WebLink
Page 22 of4/19/2024 12:03 PMEverett WFPDB GMP WIP4211GMPWIP 110 <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />7,155.820.000.000.003,255.000.00277.773,623.051,356.022,267.03Total <br />7,155.820.000.000.003,255.000.00277.773,623.051,356.022,267.03U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />7,155.82001.00001.00001.0000390.08200.100010.00003,900.8200 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />2,267.030090.576340.00000.025040.0000 <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />1.00Equipment Pcs:4.00Labor Pcs:10.00Crew Hrs:100.00Eff:10HUProd:(Mod) Pipe FL/3 MenPCF3Crew: <br />CMA covers misc discharge piping and fuel for initial drawdown. <br />72" PUD <br />60" PUD <br />Screenhouse Line <br />Cross <br />5 line <br />etc... <br />Notes: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />1,627.501.09108.501.00DOL1,500.001.00Consumable Matl Allowance3CMA <br />1,627.501,627.50108.501,500.00EA1.001.00Pumping Equipment3PUMP <br />277.7727.78109.7526.38HR10.001.00Genie 842 Forklift 8K 42'8FL08 <br />2,484.9182.83110.0046.86MH30.003.00Laborer - General G3/4LG <br />1,138.14113.81110.0065.51MH10.001.00Oper Ldr<6 CY/Ex->30MT G2O2 <br />EAUnit:4.00Quantity:PI - Cut and Weld660-04Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />65,780.180.000.0020,000.000.003,333.3323,307.1719,139.687,059.9512,079.73Total <br />16,445.050.000.005,000.000.00833.335,826.794,784.921,764.993,019.93U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />10,963.36331.50000.66676.0000707.44750.066715.000010,611.7125 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />3,019.9325106.331645.00000.0222180.0000 <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />1.00Equipment Pcs:3.00Labor Pcs:60.00Crew Hrs:100.00Eff:15HUProd:(Mod) Hoist RT600/3 MenHOC53Crew: <br />Transfered 2 ea. to Allowance bid item <br />CMA = Shims, Filler pieces, backing rings, taps, etc. <br />Notes: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />3,333.331.00100.001.00DOL3,333.331.00Perm Matl Allowance2CMA <br />20,000.005,000.00100.005,000.00EA4.001.00SUB - Pipe Welding4WELD <br />23,307.17388.45109.75358.34HR60.001.00Grove RT880E 80 Ton8CRRG8 <br />4,969.8382.83110.0046.86MH60.001.00Laborer - General G3/4LG <br />6,904.46115.07110.0066.27MH60.001.00Oper Crane <100T G1OC1 <br />7,265.39121.09110.0069.89MH60.001.00Pipefitter JourneymanPFJ <br />EAUnit:4.00Quantity:PI - Coating and Lining660-06Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />10,194.920.000.000.000.003,666.67994.395,533.862,067.573,466.29Total <br />2,548.730.000.000.000.00916.67248.601,383.47516.89866.57U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />5,097.46000.50002.00002.0000326.41250.20005.00001,632.0625 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />866.572592.231015.00000.066760.0000 <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: