Page 23 of4/19/2024 12:03 PMEverett WFPDB GMP WIP4211GMPWIP 110
<br />1.00Equipment Pcs:3.00Labor Pcs:20.00Crew Hrs:100.00Eff:5HUProd:(Mod) Pipe Test AC185/2 MenPCT2Crew:
<br />Transfered 2 ea. to Allowance bid item
<br />CMA - joint sealant / wraps / grout bags / etc
<br />Notes:
<br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource
<br />1,666.671.00100.001.00DOL1,666.671.00Perm Matl Allowance2CMA
<br />2,000.00500.00100.00500.00EA4.001.00Epoxy Paint2PNT
<br />994.3949.72109.7545.99HR20.001.00185 CFM Compressor8AC185
<br />1,656.6182.83110.0046.86MH20.001.00Laborer - General G3/4LG
<br />2,421.80121.09110.0069.89MH20.001.00Pipefitter JourneymanPFJ
<br />1,455.4572.77110.0040.80MH20.001.00Painter JourneymanPNJ
<br />EAUnit:10.00Quantity:PI - Install Valves and DMJ's660-07Activity:
<br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor
<br />70,265.580.000.000.000.000.0029,133.9741,131.6115,132.8725,998.74Total
<br />7,026.560.000.000.000.000.002,913.404,113.161,513.292,599.87U. Cost
<br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit
<br />7,026.55801.00001.000010.0000702.65580.100010.00007,026.5580
<br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours
<br />2,599.8740109.684337.50000.0267375.0000
<br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar:
<br />0.75Equipment Pcs:3.75Labor Pcs:100.00Crew Hrs:100.00Eff:10HUProd:(Mod) Hoist RT600/3 MenHOC53Crew:
<br />Transfered 1 ea. to Allowance bid itemNotes:
<br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource
<br />29,133.97388.45109.75358.34HR75.000.75Grove RT880E 80 Ton8CRRG8
<br />8,283.0582.83110.0046.86MH100.001.00Laborer - General G3/4LG
<br />8,630.57115.07110.0066.27MH75.000.75Oper Crane <100T G1OC1
<br />24,217.99121.09110.0069.89MH200.002.00Pipefitter JourneymanPFJ
<br />EAUnit:7.00Quantity:PI - Install Valve Operators660-08Activity:
<br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor
<br />12,137.220.000.000.000.005,000.000.007,137.222,642.194,495.03Total
<br />1,733.890.000.000.000.00714.290.001,019.60377.46642.15U. Cost
<br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit
<br />3,467.77710.50002.00003.5000203.92060.20005.00001,019.6029
<br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours
<br />642.1471101.960310.00000.100070.0000
<br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar:
<br />0.00Equipment Pcs:2.00Labor Pcs:35.00Crew Hrs:100.00Eff:5HUProd:(Mod) Hoist RT600/3 MenHOC53Crew:
<br />allowance - stem extensions, soil pipe (valve can extensions), bracing, etc.Notes:
<br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource
<br />5,000.001.00100.001.00DOL5,000.001.00Perm Matl Allowance2CMA
<br />2,899.0782.83110.0046.86MH35.001.00Laborer - General G3/4LG
<br />4,238.15121.09110.0069.89MH35.001.00Pipefitter JourneymanPFJ
<br />EAUnit:2.00Quantity:PI - Install Flow Meter and Transducer660-09Activity:
<br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor
<br />14,148.960.000.000.000.000.007,769.066,379.902,353.324,026.58Total
<br />7,074.480.000.000.000.000.003,884.533,189.951,176.662,013.29U. Cost
<br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit
|