My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO Construction 5/1/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO Construction 5/1/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2024 3:02:12 PM
Creation date
5/1/2024 1:07:33 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO Construction
Approval Date
5/1/2024
End Date
4/30/2026
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
Capital Improvements at the Water Filtration Plant
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0003343
Total Compensation
$26,270,329.25
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2611
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Page 24 of4/19/2024 12:03 PMEverett WFPDB GMP WIP4211GMPWIP 110 <br />7,074.48001.00001.00002.0000707.44800.100010.00007,074.4800 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />2,013.2900106.331730.00000.033360.0000 <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />1.00Equipment Pcs:3.00Labor Pcs:20.00Crew Hrs:100.00Eff:10HUProd:(Mod) Hoist RT600/3 MenHOC53Crew: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />7,769.06388.45109.75358.34HR20.001.00Grove RT880E 80 Ton8CRRG8 <br />1,656.6182.83110.0046.86MH20.001.00Laborer - General G3/4LG <br />2,301.49115.07110.0066.27MH20.001.00Oper Crane <100T G1OC1 <br />2,421.80121.09110.0069.89MH20.001.00Pipefitter JourneymanPFJ <br />LSUnit:1.00Quantity:PI - Disinfect / Visual Test660-11Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />3,572.520.000.000.000.00500.00277.772,794.751,043.181,751.57Total <br />3,572.520.000.000.000.00500.00277.772,794.751,043.181,751.57U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />3,572.52001.00001.00001.0000307.25200.100010.00003,072.5200 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />1,751.570093.158330.00000.033330.0000 <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />1.00Equipment Pcs:3.00Labor Pcs:10.00Crew Hrs:100.00Eff:10HUProd:(Mod) Pipe FL/3 MenPCF3Crew: <br />CMA - Misc. disinfection items / equipment - may or may not be provided by CityNotes: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />500.001.00100.001.00DOL500.001.00Perm Matl Allowance2CMA <br />277.7727.78109.7526.38HR10.001.00Genie 842 Forklift 8K 42'8FL08 <br />1,656.6182.83110.0046.86MH20.002.00Laborer - General G3/4LG <br />1,138.14113.81110.0065.51MH10.001.00Oper Ldr<6 CY/Ex->30MT G2O2 <br />EAUnit:7.00Quantity:PI - Pipe Spools and Blind Flanges660-12Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />64,895.340.000.000.000.000.0022,338.1442,557.2015,705.3326,851.87Total <br />9,270.760.000.000.000.000.003,191.166,079.602,243.623,835.98U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />9,270.76291.00001.00007.0000927.07630.100010.00009,270.7629 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />3,835.9814105.732257.50000.0174402.5000 <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />1.75Equipment Pcs:5.75Labor Pcs:70.00Crew Hrs:100.00Eff:10HUProd:(Mod) Pipe FL/3 MenPCF3Crew: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />20,393.78388.45109.75358.34HR52.500.75Grove RT880E 80 Ton8CRRG8 <br />1,944.3627.78109.7526.38HR70.001.00Genie 842 Forklift 8K 42'8FL08 <br />11,596.2682.83110.0046.86MH140.002.00Laborer - General G3/4LG <br />7,966.95113.81110.0065.51MH70.001.00Oper Ldr<6 CY/Ex->30MT G2O2 <br />6,041.40115.07110.0066.27MH52.500.75Oper Crane <100T G1OC1 <br />16,952.59121.09110.0069.89MH140.002.00Pipefitter JourneymanPFJ <br />EAUnit:1.00Quantity:PI - Air Vac, Misc. Small diameter660-22Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor
The URL can be used to link to this page
Your browser does not support the video tag.