My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO Construction 5/1/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO Construction 5/1/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2024 3:02:12 PM
Creation date
5/1/2024 1:07:33 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO Construction
Approval Date
5/1/2024
End Date
4/30/2026
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
Capital Improvements at the Water Filtration Plant
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0003343
Total Compensation
$26,270,329.25
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2611
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Page 25 of4/19/2024 12:03 PMEverett WFPDB GMP WIP4211GMPWIP 110 <br />6,425.110.000.000.000.000.00416.656,008.462,227.863,780.60Total <br />6,425.110.000.000.000.000.00416.656,008.462,227.863,780.60U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />4,283.40671.50000.66671.5000428.34070.066715.00006,425.1100 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />3,780.6000100.141060.00000.016760.0000 <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />1.00Equipment Pcs:4.00Labor Pcs:15.00Crew Hrs:100.00Eff:15HUProd:(Mod) Pipe FL/3 MenPCF3Crew: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />416.6527.78109.7526.38HR15.001.00Genie 842 Forklift 8K 42'8FL08 <br />2,484.9182.83110.0046.86MH30.002.00Laborer - General G3/4LG <br />1,707.20113.81110.0065.51MH15.001.00Oper Ldr<6 CY/Ex->30MT G2O2 <br />1,816.35121.09110.0069.89MH15.001.00Pipefitter JourneymanPFJ <br />EAUnit:12.00Quantity:PI - Cathodic Protection Jumpers660-30Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />14,641.260.000.000.000.006,000.001,619.237,022.032,570.204,451.83Total <br />1,220.110.000.000.000.00500.00134.94585.17214.18370.99U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />4,880.42000.25004.00003.0000288.04200.40002.5000720.1050 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />370.9858117.03385.00000.200060.0000 <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />1.00Equipment Pcs:2.00Labor Pcs:30.00Crew Hrs:100.00Eff:2.5HUProd:(Mod) Utility Crew X135T/3 MenPCUX3Crew: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />6,000.00500.00100.00500.00EA12.001.00Cathodic Protection2CP <br />1,619.2353.97109.7549.58HR30.001.00Takeuchi 135 Excvatr 3.5MT8EX135T <br />3,389.33112.98110.0065.01MH30.001.00Oper Dzr->D9/Ex->15MT G3O3 <br />3,632.70121.09110.0069.89MH30.001.00Pipefitter JourneymanPFJ <br />EAUnit:3.00Quantity:PC Vaults and Lids - Purchase660-40Activity: <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />48,534.0048,534.00100.0048,534.00LS1.001.00OLDCASTLE - Precast Vaults2PCVAULT <br />EAUnit:2.00Quantity:PC Vaults - Set Small660-41Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />5,494.320.000.000.000.000.00277.775,216.551,927.313,289.24Total <br />2,747.160.000.000.000.000.00138.892,608.28963.661,644.62U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />5,494.32000.50002.00001.0000549.43200.20005.00002,747.1600 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />1,644.6200104.331025.00000.040050.0000 <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />1.00Equipment Pcs:5.00Labor Pcs:10.00Crew Hrs:100.00Eff:5HUProd:(Mod) Pipe FL/3 MenPCF3Crew: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />277.7727.78109.7526.38HR10.001.00Genie 842 Forklift 8K 42'8FL08 <br />1,656.6182.83110.0046.86MH20.002.00Laborer - General G3/4LG <br />1,138.14113.81110.0065.51MH10.001.00Oper Ldr<6 CY/Ex->30MT G2O2
The URL can be used to link to this page
Your browser does not support the video tag.