Page 26 of4/19/2024 12:03 PMEverett WFPDB GMP WIP4211GMPWIP 110
<br />2,421.80121.09110.0069.89MH20.002.00Pipefitter JourneymanPFJ
<br />PCSUnit:6.00Quantity:PC Vaults - Set large panel vault660-42Activity:
<br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor
<br />37,679.790.000.000.000.0012,500.008,324.5916,855.206,222.2010,633.00Total
<br />6,279.970.000.000.000.002,083.331,387.432,809.201,037.031,772.17U. Cost
<br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit
<br />18,839.89500.33333.00002.00001,258.98950.30003.33334,196.6317
<br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours
<br />1,772.1667105.345026.66670.0375160.0000
<br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar:
<br />2.00Equipment Pcs:8.00Labor Pcs:20.00Crew Hrs:100.00Eff:3.3333HUProd:(Mod) Pipe FL/3 MenPCF3Crew:
<br />Allowance:
<br />Mastic
<br />Grout
<br />Link Seals
<br />CIP floor to create slope to sump
<br />etc.
<br />Notes:
<br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource
<br />12,500.001.00100.001.00DOL12,500.001.00Perm Matl Allowance2CMA
<br />7,769.06388.45109.75358.34HR20.001.00Grove RT880E 80 Ton8CRRG8
<br />555.5327.78109.7526.38HR20.001.00Genie 842 Forklift 8K 42'8FL08
<br />4,120.62103.02110.0059.01MH40.002.00Carpenter JourneymanCJ
<br />3,313.2282.83110.0046.86MH40.002.00Laborer - General G3/4LG
<br />2,276.27113.81110.0065.51MH20.001.00Oper Ldr<6 CY/Ex->30MT G2O2
<br />2,301.49115.07110.0066.27MH20.001.00Oper Crane <100T G1OC1
<br />4,843.60121.09110.0069.89MH40.002.00Pipefitter JourneymanPFJ
<br />LS1.00013150Takeoff Qty:
<br />Bid Qty:
<br />ELECTRICALBiditem
<br />1.000 LS
<br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor
<br />238,916.460.000.00238,916.460.000.000.000.000.000.00Total
<br />238,916.460.000.00238,916.460.000.000.000.000.000.00U. Cost
<br />LSUnit:1.00Quantity:ELECTRICAL SUB906-00Activity:
<br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor
<br />238,916.460.000.00238,916.460.000.000.000.000.000.00Total
<br />238,916.460.000.00238,916.460.000.000.000.000.000.00U. Cost
<br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar:
<br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource
<br />170,646.46170,646.46100.00170,646.46LS1.001.00SERVICE - Electrical Sub4EL
<br />68,270.0068,270.00100.0068,270.00LS1.001.00QCC - I&C Sub4I&C
<br />LS1.00015000Takeoff Qty:
<br />Bid Qty:
<br />FLOCCULATION BASIN IMPROVEMENTSBiditem - Parent
<br />1.000 LS
<br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor
<br />7,329,145.2613,487.500.002,011,547.13211,201.432,964,015.97826,906.371,301,986.86482,305.79819,681.07Total
<br />7,329,145.2613,487.500.002,011,547.13211,201.432,964,015.97826,906.371,301,986.86482,305.79819,681.07U. Cost
<br />Unit/CHTotal Labor/MHBase Labor/MH$/MHMH/UnitUnit/MHManhours
|