Laserfiche WebLink
Page 27 of4/19/2024 12:03 PMEverett WFPDB GMP WIP4211GMPWIP 110 <br />0.000098.987462.3187557.219813,153.06000.000113,153.0600 <br />LS1.00015020Takeoff Qty: <br />Bid Qty: <br />EXCAVATIONBiditem - Parent <br />1.000 LS <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />154,549.211,487.500.003,570.003,450.3023,094.7044,686.2778,260.4428,596.7949,663.65Total <br />154,549.211,487.500.003,570.003,450.3023,094.7044,686.2778,260.4428,596.7949,663.65U. Cost <br />Unit/CHTotal Labor/MHBase Labor/MH$/MHMH/UnitUnit/MHManhours <br />0.0000101.137864.1815199.7276773.80000.0013773.8000 <br />LS1.00015030Takeoff Qty: <br />Bid Qty: <br />DEMOLITIONBiditem <br />1.000 LS <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />75,257.381,487.500.00390.00195.3016,500.0015,441.3641,243.2215,213.8026,029.42Total <br />75,257.381,487.500.00390.00195.3016,500.0015,441.3641,243.2215,213.8026,029.42U. Cost <br />Unit/CHTotal Labor/MHBase Labor/MH$/MHMH/UnitUnit/MHManhours <br />0.0095101.334763.9543184.9076407.00000.0025407.0000 <br />LFUnit:100.00Quantity:Sawcut ACP113-05Activity: <br />WA Road ConstructionWA0101WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />390.000.65100.000.65INFT600.001.00Saw Cut - ACP4SCA <br />SFUnit:1500.00Quantity:Remove ACP113-10Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />3,718.660.000.000.000.000.001,751.811,966.85696.621,270.23Total <br />2.480.000.000.000.000.001.171.310.460.85U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />3,718.66000.00071,500.00001.0000371.8660150.00000.00672.4791 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />0.846898.34250.013375.000020.0000 <br />WA Road ConstructionWA0101WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />1.00Equipment Pcs:2.00Labor Pcs:10.00Crew Hrs:100.00Eff:150UHProd:Excav X330/2 MenE332Crew: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />1,751.81175.18109.75161.48HR10.001.00JD 330 Excavator 33MT8EX330 <br />844.5484.45110.0049.38MH10.001.00Laborer - Grade Checker G4LGC <br />1,122.31112.23110.0066.10MH10.001.00Oper Ldr->8 CY/Ex->50MT G1O1 <br />TCYUnit:30.00Quantity:Haul Demo ACP -> Waste113-40Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />1,329.46787.500.000.00195.300.000.00346.66121.93224.73Total <br />44.3226.250.000.006.510.000.0011.564.067.49U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />4,431.53330.0100100.00000.3000115.553310.00000.100011.5553 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />7.4910115.55330.100010.00003.0000