Page 28 of4/19/2024 12:03 PMEverett WFPDB GMP WIP4211GMPWIP 110
<br />WA Road ConstructionWA0101WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar:
<br />0.00Equipment Pcs:1.00Labor Pcs:3.00Crew Hrs:100.00Eff:10UHProd:*** CREW ON FLY ***ZZCrew:
<br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource
<br />195.306.51108.506.00TCY30.001.00Dump Fee ACP/TCY3DFACP
<br />787.50175.00100.00175.00HR4.501.00Truck & Trailer - OPER5HHDTP
<br />346.66115.55110.0068.10MH3.001.00Operator ForemanOF
<br />LSUnit:1.00Quantity:Remove Existing Canopy Structure138-00Activity:
<br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor
<br />7,283.010.000.000.000.000.002,300.864,982.151,848.143,134.01Total
<br />7,283.010.000.000.000.000.002,300.864,982.151,848.143,134.01U. Cost
<br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit
<br />7,283.01001.00001.00001.0000728.30100.100010.00007,283.0100
<br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours
<br />3,134.010099.643050.00000.020050.0000
<br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar:
<br />4.00Equipment Pcs:5.00Labor Pcs:10.00Crew Hrs:100.00Eff:10HUProd:(Mod) Carpenter Crew - 4 ManC4Crew:
<br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource
<br />277.7727.78109.7526.38HR10.001.00Genie 842 Forklift 8K 42'8FL08
<br />1,704.8685.24109.7577.87HR20.002.0040' Manlift OSR8ML040
<br />318.2331.82109.7530.68HR10.001.00Ford F450 Flatbed8TKJ450
<br />1,063.38106.34110.0061.01MH10.001.00Carpenter ForemanCF
<br />3,090.47103.02110.0059.01MH30.003.00Carpenter JourneymanCJ
<br />828.3082.83110.0046.86MH10.001.00Laborer - General G3/4LG
<br />CYUnit:15.00Quantity:FRP New Foundations138-01Activity:
<br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor
<br />33,999.320.000.000.000.0015,000.002,383.9716,615.356,141.1910,474.16Total
<br />2,266.620.000.000.000.001,000.00158.931,107.69409.41698.28U. Cost
<br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit
<br />8,499.83000.26673.75004.0000474.98300.37502.66671,266.6213
<br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours
<br />698.2773103.845910.66670.0938160.0000
<br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar:
<br />2.00Equipment Pcs:4.00Labor Pcs:40.00Crew Hrs:100.00Eff:2.6667HUProd:(Mod) Carpenter Crew - 4 ManC4Crew:
<br />about 40' of continuous footing and stem wall and 2 spread footings and pier pads
<br />allowance includes forms, rebar, concrete, etc.
<br />Footings
<br />Stem Walls
<br />Spread Footings
<br />Plinths
<br />Notes:
<br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource
<br />15,000.001.00100.001.00DOL15,000.001.00Perm Matl Allowance2CMA
<br />1,111.0627.78109.7526.38HR40.001.00Genie 842 Forklift 8K 42'8FL08
<br />1,272.9131.82109.7530.68HR40.001.00Ford F450 Flatbed8TKJ450
<br />4,253.50106.34110.0061.01MH40.001.00Carpenter ForemanCF
<br />12,361.85103.02110.0059.01MH120.003.00Carpenter JourneymanCJ
<br />LSUnit:1.00Quantity:Re-Install Existing Canopy Structure138-02Activity:
<br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor
<br />23,348.990.000.000.000.001,500.006,902.5614,946.435,544.429,402.01Total
<br />23,348.990.000.000.000.001,500.006,902.5614,946.435,544.429,402.01U. Cost
|