Laserfiche WebLink
Page 54 of4/19/2024 12:03 PMEverett WFPDB GMP WIP4211GMPWIP 110 <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />41,853.830.000.000.000.000.0022,906.7218,947.116,975.0611,972.05Total <br />1,443.240.000.000.000.000.00789.89653.35240.52412.83U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />7,216.17760.20005.00005.8000721.61780.50002.00001,443.2355 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />412.8293108.89146.00000.1667174.0000 <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />1.00Equipment Pcs:3.00Labor Pcs:58.00Crew Hrs:100.00Eff:2HUProd:Hoist M85/3 MenHOC83Crew: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />22,906.72394.94109.75371.29HR58.001.00Mantwoc M85 90 T Crwlr8CRCM85 <br />6,167.57106.34110.0061.01MH58.001.00Carpenter ForemanCF <br />5,974.89103.02110.0059.01MH58.001.00Carpenter JourneymanCJ <br />6,804.65117.32110.0067.63MH58.001.00Oper Crane >200T G1AAOC3 <br />TONUnit:162.00Quantity:Place CSBC Under Conc.396-02Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />10,810.430.000.000.000.003,941.461,798.925,070.051,873.203,196.85Total <br />66.730.000.000.000.0024.3311.1031.3011.5619.73U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />6,673.10490.0100100.00001.6200424.010510.00000.100042.4010 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />19.7336104.32200.30003.333348.6000 <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />3.00Equipment Pcs:3.00Labor Pcs:16.20Crew Hrs:100.00Eff:10UHProd:(Mod) Embank D6/RL/WT/5 MenEMD5Crew: <br />3300 sf x 8" Thick = 162 TonsNotes: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />3,941.4624.33100.0024.33TON162.001.00LAKESIDE - Cr Surf Base Course <br />FOB Job2AJCSBC <br />409.0125.25109.7523.27HR16.201.0047" Dbl Drum Roller 3 MT OSR8CMDD4 <br />874.3853.97109.7549.58HR16.201.00Takeuchi 135 Excvatr 3.5MT8EX135T <br />515.5331.82109.7530.68HR16.201.00Ford F450 Flatbed8TKJ450 <br />1,409.5787.01110.0049.38MH16.201.00Laborer - Grade Checker G4LGC <br />3,660.48112.98110.0065.01MH32.402.00Oper Dzr->D9/Ex->15MT G3O3 <br />TONUnit:30.00Quantity:BF Around Bldg396-03Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />3,273.960.000.000.000.00729.90666.271,877.79693.781,184.01Total <br />109.130.000.000.000.0024.3322.2162.5923.1339.47U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />5,456.60000.020050.00000.6000424.01005.00000.200084.8020 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />39.4670104.32170.60001.666718.0000 <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />3.00Equipment Pcs:3.00Labor Pcs:6.00Crew Hrs:100.00Eff:5UHProd:(Mod) Embank D6/RL/WT/5 MenEMD5Crew: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />729.9024.33100.0024.33TON30.001.00LAKESIDE - Cr Surf Base Course <br />FOB Job2AJCSBC <br />151.4825.25109.7523.27HR6.001.0047" Dbl Drum Roller 3 MT OSR8CMDD4 <br />323.8553.98109.7549.58HR6.001.00Takeuchi 135 Excvatr 3.5MT8EX135T