My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO Construction 5/1/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO Construction 5/1/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2024 3:02:12 PM
Creation date
5/1/2024 1:07:33 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO Construction
Approval Date
5/1/2024
End Date
4/30/2026
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
Capital Improvements at the Water Filtration Plant
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0003343
Total Compensation
$26,270,329.25
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2611
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Page 55 of4/19/2024 12:03 PMEverett WFPDB GMP WIP4211GMPWIP 110 <br />190.9431.82109.7530.68HR6.001.00Ford F450 Flatbed8TKJ450 <br />522.0687.01110.0049.38MH6.001.00Laborer - Grade Checker G4LGC <br />1,355.73112.98110.0065.01MH12.002.00Oper Dzr->D9/Ex->15MT G3O3 <br />SFUnit:450.00Quantity:Pier Footing-Fine Grade Slab420-04Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />3,114.610.000.000.000.000.00541.292,573.32951.851,621.47Total <br />6.920.000.000.000.000.001.205.722.123.60U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />3,737.54700.0019540.00220.8333373.754754.00020.01856.9214 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />3.6033102.93280.055618.000025.0000 <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />2.00Equipment Pcs:3.00Labor Pcs:8.33Crew Hrs:100.00Eff:18UMProd:(Mod) Labor D4/3 MenLD3Crew: <br />Fine grade under thickend edge slab and center sumpsNotes: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />91.6811.01109.7510.21HR8.331.00Walk Behind Compactor8CMWB <br />449.6153.97109.7549.58HR8.331.00Takeuchi 135 Excvatr 3.5MT8EX135T <br />689.9882.83110.0046.86MH8.331.00Laborer - General G3/4LG <br />1,883.34112.98110.0065.01MH16.672.00Oper Dzr->D9/Ex->15MT G3O3 <br />SFUnit:3600.00Quantity:SOG-Fine Grade Slab420-06Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />9,029.440.000.000.000.000.001,840.777,188.672,666.174,522.50Total <br />2.510.000.000.000.000.000.512.000.741.26U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />6,270.44440.00042,500.00001.4400627.0444250.00000.00402.5082 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />1.256399.84260.020050.000072.0000 <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />3.00Equipment Pcs:5.00Labor Pcs:14.40Crew Hrs:100.00Eff:50UMProd:(Mod) Labor D4/3 MenLD3Crew: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />363.5625.25109.7523.27HR14.401.0047" Dbl Drum Roller 3 MT OSR8CMDD4 <br />777.2353.97109.7549.58HR14.401.00Takeuchi 135 Excvatr 3.5MT8EX135T <br />699.9848.61109.7545.18HR14.401.00Water Truck 4000 Gal8WAT4 <br />1,240.5986.15110.0048.86MH14.401.00Laborer ForemanLF <br />1,192.7582.83110.0046.86MH14.401.00Laborer - General G3/4LG <br />3,253.75112.98110.0065.01MH28.802.00Oper Dzr->D9/Ex->15MT G3O3 <br />1,501.58104.28110.0059.77MH14.401.00Operator TeamsterOT <br />SFUnit:100.00Quantity:SOG-S/S Exterior Slab Edge Form420-20Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />2,795.050.000.000.000.000.00198.892,596.16959.571,636.59Total <br />27.950.000.000.000.000.001.9925.969.6016.37U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />4,472.08000.0063160.00000.6250447.208016.00000.062527.9505 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />16.3659103.84640.25004.000025.0000 <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar:
The URL can be used to link to this page
Your browser does not support the video tag.