Laserfiche WebLink
Page 56 of4/19/2024 12:03 PMEverett WFPDB GMP WIP4211GMPWIP 110 <br />1.00Equipment Pcs:4.00Labor Pcs:6.25Crew Hrs:100.00Eff:4UMProd:Carpenter Crew - 4 ManC4Crew: <br />Exterior Sidewalks @ existing building - chem line excavationNotes: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />198.8931.82109.7530.68HR6.251.00Ford F450 Flatbed8TKJ450 <br />664.61106.34110.0061.01MH6.251.00Carpenter ForemanCF <br />1,931.55103.02110.0059.01MH18.753.00Carpenter JourneymanCJ <br />CYUnit:10.00Quantity:SOG-Pl Conc Slab420-44Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />5,571.010.000.00266.250.002,049.90982.242,272.62850.291,422.33Total <br />557.100.000.0026.630.00204.9998.22227.2685.03142.23U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />11,142.02000.050020.00000.5000650.97202.00000.5000325.4860 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />142.233090.90482.50000.400025.0000 <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />2.00Equipment Pcs:5.00Labor Pcs:5.00Crew Hrs:100.00Eff:2UHProd:(Mod) Screed Deck Pour 28P/6 MenCP6SCrew: <br />Exterior Sidewalks @ existing building - chem line excavationNotes: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />2,049.90186.35100.00186.35CY11.001.10SMPOINT - Class 4500 Concrete2CNR45 <br />225.00225.00100.00225.00EA1.001.00WESTERN - 28 M Conc Pump - <br />Travl4OP28T <br />41.253.75100.003.75CY11.001.10WESTERN - 28 M Conc Pump - <br />Yrdage4OP28Y <br />823.13164.63109.75150.00HR5.001.0028 M Conc Pump - OPER8OP28 <br />159.1131.82109.7530.68HR5.001.00Ford F450 Flatbed8TKJ450 <br />1,030.16103.02110.0059.01MH10.002.00Carpenter JourneymanCJ <br />1,242.4682.83110.0046.86MH15.003.00Laborer - General G3/4LG <br />LFUnit:1515.00Quantity:Site Trenching681-09Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />56,952.540.000.007,950.000.000.0019,274.2829,728.2611,043.1818,685.08Total <br />37.590.000.005.250.000.0012.7219.627.2912.33U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />7,518.48710.0050200.00007.5750646.898220.00000.050032.3449 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />12.333498.11310.20005.0000303.0000 <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />9.00Equipment Pcs:4.00Labor Pcs:75.75Crew Hrs:100.00Eff:20UHProd:(Mod) Pipe X200/4 MenPC2004Crew: <br />Pipe and install included elsewhereNotes: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />7,950.00265.00100.00265.00HR30.001.00Vacuum Truck Sub4VT <br />1,402.9118.52109.7516.88HR75.751.00Hoe Pack Excavator Mount8CMHP <br />4,088.5653.97109.7549.58HR75.751.00Takeuchi 135 Excvatr 3.5MT8EX135T <br />9,501.68125.43109.75115.48HR75.751.00JD 200 Excavator 20MT8EX200 <br />831.362.74109.752.50HR303.004.00Road Plate8SHRP <br />1,039.2013.72109.7512.50HR75.751.00Trench Box 8'H8SHT <br />2,410.5731.82109.7530.68HR75.751.00Ford F450 Pipefitter8TKJ450P <br />12,548.8182.83110.0046.86MH151.502.00Laborer - General G3/4LG <br />8,621.39113.81110.0065.51MH75.751.00Oper Ldr<6 CY/Ex->30MT G2O2