Laserfiche WebLink
Page 72 of4/19/2024 12:03 PMEverett WFPDB GMP WIP4211GMPWIP 110 <br />1,881.52125.43109.75115.48HR15.001.00JD 200 Excavator 20MT8EX200 <br />1,305.1587.01110.0049.38MH15.001.00Laborer - Grade Checker G4LGC <br />1,707.20113.81110.0065.51MH15.001.00Oper Ldr<6 CY/Ex->30MT G2O2 <br />MOUnit:1.00Quantity:SUB Dewatering655-98Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />77,240.050.000.0077,240.050.000.000.000.000.000.00Total <br />77,240.050.000.0077,240.050.000.000.000.000.000.00U. Cost <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />NOTES: includes mob <br />$184,500 for 13 wells ~ $14,250 ea <br />8 @ Screenhouse area <br />5 @ CFDS area <br />Notes: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />70,961.5514,192.31100.0014,192.31EA5.001.00MALCOLM - SUB - Dewatering <br />Install4DWINSTALL <br />6,278.506,278.50100.006,278.50MO1.001.00MALCOLM - SUB - Dewatering <br />Monthly4DWOPERATE <br />LSUnit:1.00Quantity:ELECTRICAL SUB906-00Activity: <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />6,706.116,706.11100.006,706.11LS1.001.00SERVICE - Electrical Sub4EL <br />LS1.00017030Takeoff Qty: <br />Bid Qty: <br />EXCAVATIONBiditem - Parent <br />1.000 LS <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />88,771.141,968.750.007,358.002,321.907,060.4526,063.8243,998.2215,854.7528,143.47Total <br />88,771.141,968.750.007,358.002,321.907,060.4526,063.8243,998.2215,854.7528,143.47U. Cost <br />Unit/CHTotal Labor/MHBase Labor/MH$/MHMH/UnitUnit/MHManhours <br />0.0000100.608864.3544202.9890437.32000.0023437.3200 <br />LS1.00017040Takeoff Qty: <br />Bid Qty: <br />DEMOLITIONBiditem <br />1.000 LS <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />8,437.871,968.750.00468.00423.150.002,627.712,950.261,044.921,905.34Total <br />8,437.871,968.750.00468.00423.150.002,627.712,950.261,044.921,905.34U. Cost <br />Unit/CHTotal Labor/MHBase Labor/MH$/MHMH/UnitUnit/MHManhours <br />0.046598.342063.5113281.262330.00000.033330.0000 <br />LFUnit:330.00Quantity:Sawcut ACP113-05Activity: <br />WA Road ConstructionWA0101WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />468.000.65100.000.65INFT720.001.00Saw Cut - ACP4SCA <br />SFUnit:3500.00Quantity:Remove ACP113-10Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor