Laserfiche WebLink
Page 73 of4/19/2024 12:03 PMEverett WFPDB GMP WIP4211GMPWIP 110 <br />5,577.970.000.000.000.000.002,627.712,950.261,044.921,905.34Total <br />1.590.000.000.000.000.000.750.840.300.54U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />3,718.64670.00042,333.33331.5000371.8647233.33330.00431.5937 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />0.544498.34200.0086116.666730.0000 <br />WA Road ConstructionWA0101WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />1.00Equipment Pcs:2.00Labor Pcs:15.00Crew Hrs:100.00Eff:233.3333UHProd:Excav X330/2 MenE332Crew: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />2,627.71175.18109.75161.48HR15.001.00JD 330 Excavator 33MT8EX330 <br />1,266.8184.45110.0049.38MH15.001.00Laborer - Grade Checker G4LGC <br />1,683.45112.23110.0066.10MH15.001.00Oper Ldr->8 CY/Ex->50MT G1O1 <br />TCYUnit:65.00Quantity:Haul Demo ACP -> Waste113-40Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />2,391.901,968.750.000.00423.150.000.000.000.000.00Total <br />36.8030.290.000.006.510.000.000.000.000.00U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />3,679.84620.0100100.00000.65000.000010.00000.10000.0000 <br />WA Road ConstructionWA0101WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />0.00Equipment Pcs:0.00Labor Pcs:6.50Crew Hrs:100.00Eff:10UHProd:(Mod) *** CREW ON FLY ***ZZCrew: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />423.156.51108.506.00TCY65.001.00Dump Fee ACP/TCY3DFACP <br />1,968.75175.00100.00175.00HR11.251.00Truck & Trailer - OPER5HHDTP <br />LS1.00017050Takeoff Qty: <br />Bid Qty: <br />POTHOLING / UTILITY RELOCATEBiditem <br />1.000 LS <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />43,568.800.000.005,300.000.005,666.509,891.4922,710.818,245.3114,465.50Total <br />43,568.800.000.005,300.000.005,666.509,891.4922,710.818,245.3114,465.50U. Cost <br />Unit/CHTotal Labor/MHBase Labor/MH$/MHMH/UnitUnit/MHManhours <br />0.011198.742762.8935189.4296230.00000.0043230.0000 <br />EAUnit:10.00Quantity:Pothole - Backhoe065-10Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />11,991.810.000.000.000.000.003,763.048,228.772,924.685,304.09Total <br />1,199.180.000.000.000.000.00376.30822.88292.47530.41U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />3,997.27000.30003.33333.0000399.72700.33333.00001,199.1810 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />530.409091.43089.00000.111190.0000 <br />WA Road ConstructionWA0101WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />1.00Equipment Pcs:3.00Labor Pcs:30.00Crew Hrs:100.00Eff:9MUProd:Labor X160/3 MenLX3Crew: <br />Pothole backhoe to excavate overburden and get close to utilities <br />Pothole Vactor to get from open cut areas to and past utilities <br />Sample lines <br />Injection (alum, poly, chlorine, fluoride, etc) <br />Chemicals <br />Utilities <br />Must treat all abandoned utilities as live until determined otherwise. <br />Notes: