Laserfiche WebLink
Page 74 of4/19/2024 12:03 PMEverett WFPDB GMP WIP4211GMPWIP 110 <br />Pothole backhoe to excavate overburden and get close to utilitiesPothole Vactor to get from open cut areas to and past utilities <br />Sample lines <br />Injection (alum, poly, chlorine, fluoride, etc) <br />Chemicals <br />Utilities <br />Must treat all abandoned utilities as live until determined otherwise. <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />3,763.04125.43109.75115.48HR30.001.00JD 200 Excavator 20MT8EX200 <br />2,507.8983.60110.0048.86MH30.001.00Laborer ForemanLF <br />2,408.2380.27110.0046.86MH30.001.00Laborer - General G3/4LG <br />3,312.65110.42110.0065.01MH30.001.00Oper Dzr->D9/Ex->15MT G3O3 <br />EAUnit:10.00Quantity:Pothole - Vactor Truck065-20Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />6,905.490.000.005,300.000.000.000.001,605.49574.571,030.92Total <br />690.550.000.00530.000.000.000.00160.5557.46103.09U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />3,452.74500.20005.00002.000080.27450.50002.0000160.5490 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />103.092080.27452.00000.500020.0000 <br />WA Road ConstructionWA0101WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />0.00Equipment Pcs:1.00Labor Pcs:20.00Crew Hrs:100.00Eff:2HUProd:(Mod) Labor Crew - 2 MenL2Crew: <br />Pothole backhoe to excavate overburden and get close to utilities <br />Pothole Vactor to get from open cut areas to and past utilities <br />Sample lines <br />Injection (alum, poly, chlorine, fluoride, etc) <br />Chemicals <br />Utilities <br />Must treat all abandoned utilities as live until determined otherwise. <br />Notes: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />5,300.00265.00100.00265.00HR20.001.00Vacuum Truck Sub4VT <br />1,605.4980.27110.0046.86MH20.001.00Laborer - General G3/4LG <br />LSUnit:1.00Quantity:Relocate Utilities695-00Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />24,671.500.000.000.000.005,666.506,128.4512,876.554,746.068,130.49Total <br />24,671.500.000.000.000.005,666.506,128.4512,876.554,746.068,130.49U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />6,167.87504.00000.25004.0000475.12500.025040.000019,005.0000 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />8,130.4900107.3046120.00000.0083120.0000 <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />2.00Equipment Pcs:3.00Labor Pcs:40.00Crew Hrs:100.00Eff:40HUProd:(Mod) Excav X200/2 MenE202Crew: <br />Assume: <br />Sample lines <br />injection lines???? <br /> - Alum <br /> - Poly <br /> - Chlorine <br /> - Fluoride <br />Notes: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />1,166.5023.33100.0023.33TON50.001.00LAKESIDE - Gvl BF Pipe Zone <br />Bed FOB Job2AJGPZ <br />3,000.001,500.00100.001,500.00EA2.001.00Precast Vaults2PCVAULT <br />1,500.002.50100.002.50LF600.001.003" PVC Pipe2PIPV03 <br />5,017.39125.43109.75115.48HR40.001.00JD 200 Excavator 20MT8EX200 <br />1,111.0627.78109.7526.38HR40.001.00Genie 842 Forklift 8K 42'8FL08 <br />3,480.4087.01110.0049.38MH40.001.00Laborer - Grade Checker G4LGC <br />4,552.55113.81110.0065.51MH40.001.00Oper Ldr<6 CY/Ex->30MT G2O2 <br />4,843.60121.09110.0069.89MH40.001.00Pipefitter JourneymanPFJ