Laserfiche WebLink
Page 75 of4/19/2024 12:03 PMEverett WFPDB GMP WIP4211GMPWIP 110 <br />LS1.00017060Takeoff Qty: <br />Bid Qty: <br />OPEN SITEBiditem <br />1.000 LS <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />10,807.930.000.000.000.000.004,741.666,066.272,142.593,923.68Total <br />10,807.930.000.000.000.000.004,741.666,066.272,142.593,923.68U. Cost <br />Unit/CHTotal Labor/MHBase Labor/MH$/MHMH/UnitUnit/MHManhours <br />0.0690104.590967.6497186.343658.00000.017258.0000 <br />TCYUnit:290.00Quantity:Struct Exc-Exc->Embnk/Stockpile215-05Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />10,807.930.000.000.000.000.004,741.666,066.272,142.593,923.68Total <br />37.270.000.000.000.000.0016.3520.927.3913.53U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />7,453.74480.0050200.00001.4500745.374520.00000.050037.2687 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />13.5299104.59090.20005.000058.0000 <br />WA Road ConstructionWA0101WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />3.00Equipment Pcs:4.00Labor Pcs:14.50Crew Hrs:100.00Eff:20UHProd:(Mod) Excav X330/2 MenE332Crew: <br />Excavate area to approximate 4' cut to have working shelf for relocating utilities and securing <br />20 TCY / CH <br />Excavate and pack off asphalt w/ loader <br />Notes: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />782.6353.97109.7549.58HR14.501.00Takeuchi 135 Excvatr 3.5MT8EX135T <br />2,540.12175.18109.75161.48HR14.501.00JD 330 Excavator 33MT8EX330 <br />1,418.9197.86109.7590.74HR14.501.00JD 644 Loader 4.5 CY8LD644 <br />1,224.5884.45110.0049.38MH14.501.00Laborer - Grade Checker G4LGC <br />1,627.34112.23110.0066.10MH14.501.00Oper Ldr->8 CY/Ex->50MT G1O1 <br />1,613.24111.26110.0065.51MH14.501.00Oper Ldr<6 CY/Ex->30MT G2O2 <br />1,601.11110.42110.0065.01MH14.501.00Oper Dzr->D9/Ex->15MT G3O3 <br />LS1.00017070Takeoff Qty: <br />Bid Qty: <br />MASS EXCAVATIONBiditem <br />1.000 LS <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />5,463.610.000.000.000.000.002,396.983,066.631,083.141,983.49Total <br />5,463.610.000.000.000.000.002,396.983,066.631,083.141,983.49U. Cost <br />Unit/CHTotal Labor/MHBase Labor/MH$/MHMH/UnitUnit/MHManhours <br />0.1364104.591767.6497186.344129.32000.034129.3200 <br />TCYUnit:220.00Quantity:Struct Exc-Exc->Embnk/Stockpile215-05Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />5,463.610.000.000.000.000.002,396.983,066.631,083.141,983.49Total <br />24.830.000.000.000.000.0010.9013.944.929.02U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />7,450.41110.0033300.00140.7333745.041130.00010.033324.8346 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />9.0159104.59170.13337.503429.3200