My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO Construction 5/1/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO Construction 5/1/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2024 3:02:12 PM
Creation date
5/1/2024 1:07:33 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO Construction
Approval Date
5/1/2024
End Date
4/30/2026
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
Capital Improvements at the Water Filtration Plant
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0003343
Total Compensation
$26,270,329.25
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2611
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Page 76 of4/19/2024 12:03 PMEverett WFPDB GMP WIP4211GMPWIP 110 <br />WA Road ConstructionWA0101WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />3.00Equipment Pcs:4.00Labor Pcs:7.33Crew Hrs:100.00Eff:30UHProd:(Mod) Excav X330/2 MenE332Crew: <br />Mass excavation - Quicker production - assume past shallow utilities, but need to start setting boxes <br />40 TCY / CH - REDUCE to 30 TCY/HR due to economy of scale <br />Excavate and pack off asphalt w/ loader <br />Notes: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />395.6353.97109.7549.58HR7.331.00Takeuchi 135 Excvatr 3.5MT8EX135T <br />1,284.07175.18109.75161.48HR7.331.00JD 330 Excavator 33MT8EX330 <br />717.2897.86109.7590.74HR7.331.00JD 644 Loader 4.5 CY8LD644 <br />619.0584.45110.0049.38MH7.331.00Laborer - Grade Checker G4LGC <br />822.66112.23110.0066.10MH7.331.00Oper Ldr->8 CY/Ex->50MT G1O1 <br />815.52111.26110.0065.51MH7.331.00Oper Ldr<6 CY/Ex->30MT G2O2 <br />809.40110.42110.0065.01MH7.331.00Oper Dzr->D9/Ex->15MT G3O3 <br />LS1.00017080Takeoff Qty: <br />Bid Qty: <br />DENTAL EXCAVATIONBiditem <br />1.000 LS <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />9,043.760.000.001,590.000.000.003,270.114,183.651,477.662,705.99Total <br />9,043.760.000.001,590.000.000.003,270.114,183.651,477.662,705.99U. Cost <br />Unit/CHTotal Labor/MHBase Labor/MH$/MHMH/UnitUnit/MHManhours <br />0.1000104.591367.6498226.094040.00000.025040.0000 <br />TCYUnit:100.00Quantity:Struct Exc-Exc->Embnk/Stockpile215-05Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />9,043.760.000.001,590.000.000.003,270.114,183.651,477.662,705.99Total <br />90.440.000.0015.900.000.0032.7041.8414.7827.06U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />9,043.76000.0100100.00001.0000745.376010.00000.100074.5376 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />27.0599104.59130.40002.500040.0000 <br />WA Road ConstructionWA0101WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />3.00Equipment Pcs:4.00Labor Pcs:10.00Crew Hrs:100.00Eff:10UHProd:(Mod) Excav X330/2 MenE332Crew: <br />Excavate around and under large utilities - slow down production again <br />10 TCY / CH <br />Excavate and pack off asphalt w/ loader <br />Notes: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />1,590.00265.00100.00265.00HR6.001.00Vacuum Truck Sub4VT <br />539.7453.97109.7549.58HR10.001.00Takeuchi 135 Excvatr 3.5MT8EX135T <br />1,751.81175.18109.75161.48HR10.001.00JD 330 Excavator 33MT8EX330 <br />978.5697.86109.7590.74HR10.001.00JD 644 Loader 4.5 CY8LD644 <br />844.5484.45110.0049.38MH10.001.00Laborer - Grade Checker G4LGC <br />1,122.31112.23110.0066.10MH10.001.00Oper Ldr->8 CY/Ex->50MT G1O1 <br />1,112.58111.26110.0065.51MH10.001.00Oper Ldr<6 CY/Ex->30MT G2O2 <br />1,104.22110.42110.0065.01MH10.001.00Oper Dzr->D9/Ex->15MT G3O3 <br />EX SUPPORT / MISCBiditem
The URL can be used to link to this page
Your browser does not support the video tag.