Laserfiche WebLink
Page 84 of4/19/2024 12:03 PMEverett WFPDB GMP WIP4211GMPWIP 110 <br />9,040.020.000.000.005,967.500.00277.772,794.751,043.181,751.57Total <br />9,040.020.000.000.005,967.500.00277.772,794.751,043.181,751.57U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />9,040.02001.00001.00001.0000307.25200.100010.00003,072.5200 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />1,751.570093.158330.00000.033330.0000 <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />1.00Equipment Pcs:3.00Labor Pcs:10.00Crew Hrs:100.00Eff:10HUProd:(Mod) Pipe FL/3 MenPCF3Crew: <br />CMA covers misc discharge piping and fuel for initial drawdown.Notes: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />2,712.501.09108.501.00DOL2,500.001.00Consumable Matl Allowance3CMA <br />3,255.001,627.50108.501,500.00EA2.001.00Pumping Equipment3PUMP <br />277.7727.78109.7526.38HR10.001.00Genie 842 Forklift 8K 42'8FL08 <br />1,656.6182.83110.0046.86MH20.002.00Laborer - General G3/4LG <br />1,138.14113.81110.0065.51MH10.001.00Oper Ldr<6 CY/Ex->30MT G2O2 <br />EAUnit:4.00Quantity:Sawcut Access Hatches797-05Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />14,508.640.000.005,000.000.000.004,661.434,847.211,795.953,051.26Total <br />3,627.160.000.001,250.000.000.001,165.361,211.80448.99762.82U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />12,090.53330.30003.33331.2000792.38670.33333.00002,377.1600 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />762.8150100.983512.00000.083348.0000 <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />1.00Equipment Pcs:4.00Labor Pcs:12.00Crew Hrs:100.00Eff:3HUProd:(Mod) Hoist RT600/3 MenHOC53Crew: <br />NOTE: <br />Install anchors on top <br />Sawcut into chunks and hoist <br />No temporary supports included at this time... <br />Notes: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />5,000.005,000.00100.005,000.00LS1.001.00Saw Cut - Conc4SCC <br />4,661.43388.45109.75358.34HR12.001.00Grove RT880E 80 Ton8CRRG8 <br />2,472.36103.02110.0059.01MH24.002.00Carpenter JourneymanCJ <br />993.9682.83110.0046.86MH12.001.00Laborer - General G3/4LG <br />1,380.89115.07110.0066.27MH12.001.00Oper Crane <100T G1OC1 <br />EAUnit:3.00Quantity:Temporary Hoisting Equipment797-10Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />23,140.050.000.000.0010,850.000.001,111.0611,178.994,172.727,006.27Total <br />7,713.350.000.000.003,616.670.00370.353,726.331,390.912,335.42U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />5,785.01251.33330.75004.0000307.25130.075013.33334,096.6833 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />2,335.423393.158340.00000.0250120.0000 <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />1.00Equipment Pcs:3.00Labor Pcs:40.00Crew Hrs:100.00Eff:13.3333HUProd:(Mod) Pipe FL/3 MenPCF3Crew: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />10,850.0010,850.00108.5010,000.00LS1.001.00Hoisting Items3HOIST <br />1,111.0627.78109.7526.38HR40.001.00Genie 842 Forklift 8K 42'8FL08