Laserfiche WebLink
Page 85 of4/19/2024 12:03 PMEverett WFPDB GMP WIP4211GMPWIP 110 <br />6,626.4482.83110.0046.86MH80.002.00Laborer - General G3/4LG <br />4,552.55113.81110.0065.51MH40.001.00Oper Ldr<6 CY/Ex->30MT G2O2 <br />EAUnit:3.00Quantity:Assemble and Install Gates797-12Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />112,221.970.000.000.000.000.0034,960.7677,261.2128,774.8248,486.39Total <br />37,407.320.000.000.000.000.0011,653.5925,753.749,591.6116,162.13U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />6,234.55396.00000.166718.0000623.45540.016760.000037,407.3233 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />16,162.130095.3842270.00000.0037810.0000 <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />0.50Equipment Pcs:4.50Labor Pcs:180.00Crew Hrs:100.00Eff:60HUProd:(Mod) Hoist RT600/3 MenHOC53Crew: <br />Assembly and install to include: <br />Assemble gate pieces <br />build anchor bolt template <br />core / drill anchor bolts <br />epoxy anchor bolts <br />install gate frame <br />form behind gate <br />epoxy grout gate to wall connection <br />strip forms <br />install operator shaft <br />install bearings <br />install pedestal <br />install operators <br />etc... <br />Notes: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />34,960.76388.45109.75358.34HR90.000.50Grove RT880E 80 Ton8CRRG8 <br />37,085.55103.02110.0059.01MH360.002.00Carpenter JourneymanCJ <br />29,818.9782.83110.0046.86MH360.002.00Laborer - General G3/4LG <br />10,356.69115.07110.0066.27MH90.000.50Oper Crane <100T G1OC1 <br />EAUnit:3.00Quantity:FRP Curbs / Repairs797-14Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />15,361.850.000.000.000.003,000.000.0012,361.854,572.237,789.62Total <br />5,120.620.000.000.000.001,000.000.004,120.621,524.082,596.54U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />2,560.30832.00000.50006.0000206.03080.050020.00004,120.6167 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />2,596.5400103.015440.00000.0250120.0000 <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />0.00Equipment Pcs:2.00Labor Pcs:60.00Crew Hrs:100.00Eff:20HUProd:(Mod) Carpenter Crew - 3 ManC3Crew: <br />Perm Allowance includes: <br />Forms <br />Rebar <br />Epoxy <br />Notes: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />3,000.001.00100.001.00DOL3,000.001.00Perm Matl Allowance2CMA <br />12,361.85103.02110.0059.01MH120.002.00Carpenter JourneymanCJ <br />EAUnit:1.00Quantity:Install Hatches797-16Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />14,302.900.000.000.000.007,500.00555.536,247.372,308.563,938.81Total <br />14,302.900.000.000.000.007,500.00555.536,247.372,308.563,938.81U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />7,151.45002.00000.50002.0000340.14500.050020.00006,802.9000