Page 85 of4/19/2024 12:03 PMEverett WFPDB GMP WIP4211GMPWIP 110
<br />6,626.4482.83110.0046.86MH80.002.00Laborer - General G3/4LG
<br />4,552.55113.81110.0065.51MH40.001.00Oper Ldr<6 CY/Ex->30MT G2O2
<br />EAUnit:3.00Quantity:Assemble and Install Gates797-12Activity:
<br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor
<br />112,221.970.000.000.000.000.0034,960.7677,261.2128,774.8248,486.39Total
<br />37,407.320.000.000.000.000.0011,653.5925,753.749,591.6116,162.13U. Cost
<br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit
<br />6,234.55396.00000.166718.0000623.45540.016760.000037,407.3233
<br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours
<br />16,162.130095.3842270.00000.0037810.0000
<br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar:
<br />0.50Equipment Pcs:4.50Labor Pcs:180.00Crew Hrs:100.00Eff:60HUProd:(Mod) Hoist RT600/3 MenHOC53Crew:
<br />Assembly and install to include:
<br />Assemble gate pieces
<br />build anchor bolt template
<br />core / drill anchor bolts
<br />epoxy anchor bolts
<br />install gate frame
<br />form behind gate
<br />epoxy grout gate to wall connection
<br />strip forms
<br />install operator shaft
<br />install bearings
<br />install pedestal
<br />install operators
<br />etc...
<br />Notes:
<br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource
<br />34,960.76388.45109.75358.34HR90.000.50Grove RT880E 80 Ton8CRRG8
<br />37,085.55103.02110.0059.01MH360.002.00Carpenter JourneymanCJ
<br />29,818.9782.83110.0046.86MH360.002.00Laborer - General G3/4LG
<br />10,356.69115.07110.0066.27MH90.000.50Oper Crane <100T G1OC1
<br />EAUnit:3.00Quantity:FRP Curbs / Repairs797-14Activity:
<br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor
<br />15,361.850.000.000.000.003,000.000.0012,361.854,572.237,789.62Total
<br />5,120.620.000.000.000.001,000.000.004,120.621,524.082,596.54U. Cost
<br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit
<br />2,560.30832.00000.50006.0000206.03080.050020.00004,120.6167
<br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours
<br />2,596.5400103.015440.00000.0250120.0000
<br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar:
<br />0.00Equipment Pcs:2.00Labor Pcs:60.00Crew Hrs:100.00Eff:20HUProd:(Mod) Carpenter Crew - 3 ManC3Crew:
<br />Perm Allowance includes:
<br />Forms
<br />Rebar
<br />Epoxy
<br />Notes:
<br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource
<br />3,000.001.00100.001.00DOL3,000.001.00Perm Matl Allowance2CMA
<br />12,361.85103.02110.0059.01MH120.002.00Carpenter JourneymanCJ
<br />EAUnit:1.00Quantity:Install Hatches797-16Activity:
<br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor
<br />14,302.900.000.000.000.007,500.00555.536,247.372,308.563,938.81Total
<br />14,302.900.000.000.000.007,500.00555.536,247.372,308.563,938.81U. Cost
<br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit
<br />7,151.45002.00000.50002.0000340.14500.050020.00006,802.9000
|