My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO Construction 5/1/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO Construction 5/1/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2024 3:02:12 PM
Creation date
5/1/2024 1:07:33 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO Construction
Approval Date
5/1/2024
End Date
4/30/2026
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
Capital Improvements at the Water Filtration Plant
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0003343
Total Compensation
$26,270,329.25
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2611
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Page 86 of4/19/2024 12:03 PMEverett WFPDB GMP WIP4211GMPWIP 110 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />3,938.8100104.122860.00000.016760.0000 <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />1.00Equipment Pcs:3.00Labor Pcs:20.00Crew Hrs:100.00Eff:20HUProd:(Mod) Carpenter Crew - 3 ManC3Crew: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />7,500.007,500.00100.007,500.00EA1.001.00Aluminum Hatches2HATCH <br />555.5327.78109.7526.38HR20.001.00Genie 842 Forklift 8K 42'8FL08 <br />2,126.75106.34110.0061.01MH20.001.00Carpenter ForemanCF <br />4,120.62103.02110.0059.01MH40.002.00Carpenter JourneymanCJ <br />EAUnit:1.00Quantity:Install Ladder797-17Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />6,700.730.000.000.000.005,000.00138.881,561.85577.14984.71Total <br />6,700.730.000.000.000.005,000.00138.881,561.85577.14984.71U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />13,401.46000.50002.00000.5000340.14600.20005.00001,700.7300 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />984.7100104.123315.00000.066715.0000 <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />1.00Equipment Pcs:3.00Labor Pcs:5.00Crew Hrs:100.00Eff:5HUProd:(Mod) Carpenter Crew - 3 ManC3Crew: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />5,000.005,000.00100.005,000.00EA1.001.00Aluminum Ladder2ALLADDER <br />138.8827.78109.7526.38HR5.001.00Genie 842 Forklift 8K 42'8FL08 <br />531.69106.34110.0061.01MH5.001.00Carpenter ForemanCF <br />1,030.16103.02110.0059.01MH10.002.00Carpenter JourneymanCJ <br />LSUnit:1.00Quantity:Concrete Repairs to Vault Lid797-18Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />8,747.370.000.000.000.002,500.000.006,247.372,308.563,938.81Total <br />8,747.370.000.000.000.002,500.000.006,247.372,308.563,938.81U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />4,373.68502.00000.50002.0000312.36850.050020.00006,247.3700 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />3,938.8100104.122860.00000.016760.0000 <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />0.00Equipment Pcs:3.00Labor Pcs:20.00Crew Hrs:100.00Eff:20HUProd:Carpenter Crew - 3 ManC3Crew: <br />Assuming one large opening will need reinforced and repaired / new concrete <br />Perm allowance includes: <br />concrete <br />reinforcing <br />bottom forming <br />Notes: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />2,500.001.00100.001.00DOL2,500.001.00Perm Matl Allowance2CMA <br />2,126.75106.34110.0061.01MH20.001.00Carpenter ForemanCF <br />4,120.62103.02110.0059.01MH40.002.00Carpenter JourneymanCJ <br />LSUnit:1.00Quantity:Disinfect Structure797-20Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />4,072.520.000.000.000.001,000.00277.772,794.751,043.181,751.57Total <br />4,072.520.000.000.000.001,000.00277.772,794.751,043.181,751.57U. Cost
The URL can be used to link to this page
Your browser does not support the video tag.