Page 87 of4/19/2024 12:03 PMEverett WFPDB GMP WIP4211GMPWIP 110
<br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit
<br />4,072.52001.00001.00001.0000307.25200.100010.00003,072.5200
<br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours
<br />1,751.570093.158330.00000.033330.0000
<br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar:
<br />1.00Equipment Pcs:3.00Labor Pcs:10.00Crew Hrs:100.00Eff:10HUProd:(Mod) Pipe FL/3 MenPCF3Crew:
<br />CMA - Misc. disinfection items / equipment - may or may not be provided by CityNotes:
<br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource
<br />1,000.001.00100.001.00DOL1,000.001.00Perm Matl Allowance2CMA
<br />277.7727.78109.7526.38HR10.001.00Genie 842 Forklift 8K 42'8FL08
<br />1,656.6182.83110.0046.86MH20.002.00Laborer - General G3/4LG
<br />1,138.14113.81110.0065.51MH10.001.00Oper Ldr<6 CY/Ex->30MT G2O2
<br />EAUnit:4.00Quantity:Injection Diffuser Changes797-28Activity:
<br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor
<br />32,636.410.000.001,200.000.0017,000.002,158.9712,277.444,543.727,733.72Total
<br />8,159.100.000.00300.000.004,250.00539.743,069.361,135.931,933.43U. Cost
<br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit
<br />8,159.10251.00001.00004.0000360.91030.100010.00003,609.1025
<br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours
<br />1,933.4300102.312030.00000.0333120.0000
<br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar:
<br />1.00Equipment Pcs:3.00Labor Pcs:40.00Crew Hrs:100.00Eff:10HUProd:(Mod) Utility Crew X135T/3 MenPCUX3Crew:
<br />Work INSIDE of structure:
<br />Allowance for removable diffuser lines for cleaning - some sort of slide rail? Pitless adapter? Unknown at this time...Notes:
<br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource
<br />15,000.001.00100.001.00DOL15,000.001.00Perm Matl Allowance2CMA
<br />2,000.002,000.00100.002,000.00LS1.001.002" PVC Pipe2PIPV02
<br />1,200.00300.00100.00300.00EA4.001.00Core Dril 9-10"x< 6" Deep4SCCF91
<br />2,158.9753.97109.7549.58HR40.001.00Takeuchi 135 Excvatr 3.5MT8EX135T
<br />4,120.62103.02110.0059.01MH40.001.00Carpenter JourneymanCJ
<br />3,313.2282.83110.0046.86MH40.001.00Laborer - General G3/4LG
<br />4,843.60121.09110.0069.89MH40.001.00Pipefitter JourneymanPFJ
<br />LSUnit:1.00Quantity:ELECTRICAL SUB906-00Activity:
<br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor
<br />108,581.210.000.00103,592.020.000.00809.614,179.581,560.532,619.05Total
<br />108,581.210.000.00103,592.020.000.00809.614,179.581,560.532,619.05U. Cost
<br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit
<br />72,387.47331.50000.66671.5000332.61270.066715.00004,989.1900
<br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours
<br />2,619.050092.879645.00000.022245.0000
<br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar:
<br />1.00Equipment Pcs:3.00Labor Pcs:15.00Crew Hrs:100.00Eff:15HUProd:Utility Crew X135T/3 MenPCUX3Crew:
<br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource
<br />103,592.02103,592.02100.00103,592.02LS1.001.00SERVICE - Electrical Sub4EL
<br />809.6153.97109.7549.58HR15.001.00Takeuchi 135 Excvatr 3.5MT8EX135T
<br />2,484.9182.83110.0046.86MH30.002.00Laborer - General G3/4LG
<br />1,694.67112.98110.0065.01MH15.001.00Oper Dzr->D9/Ex->15MT G3O3
|