My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024/05/01 Council Agenda Packet
>
Council Agenda Packets
>
2024
>
2024/05/01 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2024 11:26:32 AM
Creation date
5/1/2024 6:21:51 PM
Metadata
Fields
Template:
Council Agenda Packet
Date
5/1/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />Lexington-Broadway Stormwater Imp. Phase 1 15 Scope of Services <br />B. Providing information and preparation of exhibits for the City’s use may require up to 4 <br />hours of project manager time and up to 32 hours of staff time. <br />C. There will be up to two exhibits and one informational (single-page) handout. <br />D. The community meeting handouts and exhibits will be electronically delivered. The City <br />will be responsible for printing and posting materials. <br />Deliverables <br />The following deliverables will be produced: <br />1. Agendas and meeting notes (Word or PDF) <br />2. Outreach exhibits and materials (electronic delivery Word or PDF) <br />Subtask 620 Design Services <br />Consultant Services <br />The Consultant will provide the following services: <br />1. Develop conveyance and stormwater system design including the following: <br />A. Prepare hydraulic models to evaluate interim and future buildout conditions to support <br />Task 500 design report updates. <br />B. Prepare pipe material design calculations to determine pipe material and thickness <br />(HS25 Load), trench backfill requirements, and resist buoyancy forces. <br />C. Provide trench dam design recommendations. <br />D. Validate pipe sizing and design recommendations using the methodologies outlined in <br />the SWMMWW. <br />E. Conveyance system flow split and stormwater facility hydraulic modeling. <br />2. Prepare civil design that includes the following: <br />A. General, demolition, removals, temporary erosion and sediment control (TESC), <br />stormwater conveyance, street restoration, site grading, and water quality treatment <br />facility design <br />B. Permanent utility relocation coordination for the stormwater treatment site that assumes <br />the following: <br />i. Water main relocation for approximately 150 linear feet within Lenora Street between <br />3rd Avenue and Zillah Street <br />3. Prepare landscape, irrigation, and water service design that includes the following: <br />A. Landscaping for the stormwater treatment facility including irrigation system and <br />controller. <br />B. Areas outside the treatment facility bays will be restored with gravel or native vegetation.
The URL can be used to link to this page
Your browser does not support the video tag.