My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Sound Transit 5/1/2024
>
Contracts
>
Agreement
>
Interagency Agreements (not grant agreements)
>
Sound Transit 5/1/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2024 9:26:58 AM
Creation date
5/2/2024 9:26:12 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Sound Transit
Approval Date
5/1/2024
Council Approval Date
1/31/2024
Department
Planning
Department Project Manager
Yorik Stevens-Wajda
Subject / Project Title
Everett Link Extension and Operations and Maintenance Facility North Project and Task Order 1
Tracking Number
0004325
Total Compensation
$830,000.00
Contract Type
Agreement
Contract Subtype
Interagency Agreements (not grant agreements)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br />GA 0043-23 Everett ST Task Order 1 3 <br /> <br />Category 2: Sensitive information <br />Category 2: For official use only / disclosure permissible by law. <br />Deliverables: <br />• Provide quarterly invoicing and progress reporting and on-going project management <br />activities in accordance with Attachment 4. <br /> <br /> <br />1.3 Agreements <br />The key purpose of this task is to interface with Sound Transit and provide for timely approval of <br />task orders and other relevant agreements that may be identified as required or desired during the <br />course of this phase of the Project. In the event other agreements are identified for completion <br />during this phase, this task will be used by the City for all coordination and other activities <br />associated with such agreements, letters of concurrence or other instruments. <br /> <br />Deliverables: <br />• The City will work with Sound Transit to develop a task order for future phases of the <br />Project. This work is anticipated to occur near the end of the environmental review process. <br />1.4 Project Elements <br />The City of Everett will hold primary responsibility for local jurisdiction participation in planning for <br />elements of the project within Everett city limits: Airport Rd Station alternative A and the associated <br />alignment and north from there, including OMF alternatives B and E. The City of Everett will share <br />responsibility for local jurisdiction participation with Snohomish County in planning for elements of <br />the project within Everett’s future annexation area: Airport Rd Station alternative B and the <br />associated alignment and from there south to I-5 right-of-way. The City of Everett will participate in <br />planning other elements of the extension as needed or requested. <br /> <br />Task 2: Design Review and Support <br />2.1 Review of Project Technical Memoranda and Other Documents <br />This task includes City discipline review and where appropriate, concurrence, for project documents <br />prepared in support of the DEIS, including technical memoranda, feasibility studies, basis of design <br />reports, or other documents prepared for the Project for which City review is desired by Sound Transit <br />to efficiently advance project development. The City’s Designated Representative shall resolve <br />substantial inconsistencies among review comments from the City departments and shall provide Sound
The URL can be used to link to this page
Your browser does not support the video tag.