My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Sound Transit 5/1/2024
>
Contracts
>
Agreement
>
Interagency Agreements (not grant agreements)
>
Sound Transit 5/1/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2024 9:26:58 AM
Creation date
5/2/2024 9:26:12 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Sound Transit
Approval Date
5/1/2024
Council Approval Date
1/31/2024
Department
Planning
Department Project Manager
Yorik Stevens-Wajda
Subject / Project Title
Everett Link Extension and Operations and Maintenance Facility North Project and Task Order 1
Tracking Number
0004325
Total Compensation
$830,000.00
Contract Type
Agreement
Contract Subtype
Interagency Agreements (not grant agreements)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br />GA 0043-23 Everett ST Task Order 1 4 <br /> <br />Category 2: Sensitive information <br />Category 2: For official use only / disclosure permissible by law. <br />Transit with consistent and consolidated review, comments, and decisions. The City’s Designated <br />Representative shall be responsible for ensuring all City review comments are accurately documented in <br />the correct Sound Transit design review format. The City will perform their review of documents within <br />the timeline requested by Sound Transit, which will be commensurate with the length and complexity of <br />the document being reviewed. <br />2.2 Over the Shoulder Design Review <br />The key purpose of Over the Shoulder (OTS) review during this phase is to ensure effective City <br />coordination with the Project to contribute to the effectiveness of the Project, provide local perspective, <br />and implement reasonable City plans, codes and regulations so that Sound Transit can efficiently <br />advance project development consistent with those City plans, codes and regulations. Close <br />coordination, through the regularly scheduled meetings referenced in 1.1 and additional meetings as <br />needed, will be necessary to advance, review and communicate design developments with project team <br />members and to seek feedback and concurrence from the City. City technical staff and City department <br />staff with sufficient decision-making authority will attend and represent the City at planning/engineering <br />focused meetings and workshops. <br />2.3 Formal Submittals <br />This phase of the Project will likely include two formal design submittals to the City; an ‘interim’ <br />conceptual design submittal during the DEIS preparation process and an ‘advanced’ conceptual design <br />submittal, both built from the collaborative process identified in 2.1 and 2.2. As part of these submittals, <br />City staff will review the conceptual design submittal and associated reference drawings, as well as <br />other information submitted as part of the basis of design. City review of formal submittals is intended <br />to ensure effective City coordination with the Project. Sound Transit will notify the City two to four <br />weeks in advance of providing design review packages to the City, and the City will perform a review of <br />the packages and return the unified and coordinated comments from all relevant City departments <br />within thirty (30) days. It is the responsibility of the City’s designated representative to coordinate <br />appropriate City staff review and consolidate timely review submittals. If the City requires additional <br />review time, the City will notify Sound Transit immediately, and Sound Transit will determine if <br />additional time is possible. Repeated late or delayed review submittals by the City will be elevated for <br />issue resolution consistent with Section 7 of the Partnering Agreement. <br />Deliverables: <br />• Submit consolidated and coordinated comments on the ‘interim’ conceptual design <br />submittal and the ‘advanced’ conceptual design submittal. <br />• Meetings to review and coordinate code requirements. <br />Task 3: Coordination on Environmental Review <br />As a cooperating agency with Sound Transit and the Federal Transit Administration (FTA), the City will be <br />afforded the opportunity to review Environmental Impact Statement (EIS) Technical Methods Reports as <br />well as select draft Technical Reports of the Project’s NEPA/SEPA documentation and provide feedback <br />on the same to Sound Transit. Sound Transit will notify the City two to four weeks in advance of <br />providing project environmental documents to the City and the City will perform a review of the <br />documents and return unified and coordinated comments from all relevant City departments within
The URL can be used to link to this page
Your browser does not support the video tag.