My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lakeside Industries, Inc. 5/3/2024
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2024
>
Lakeside Industries, Inc. 5/3/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2024 8:35:52 AM
Creation date
5/3/2024 8:28:40 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Lakeside Industries, Inc.
Approval Date
5/3/2024
Council Approval Date
5/8/2024
End Date
8/31/2024
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2024 Pavement Maintenance Overlay
Tracking Number
0004332
Total Compensation
$2,540,916.30
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
277
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
2024 Pavement Maintenance Overlay SPECIAL PROVISIONS PW# 3823 26 No lane closures or single lane alternating flagging operation will be permitted between 1 10:00pm and 7:00am. The contractor has been granted a 1 hour early start from 2 6:00am to 7:00am for traffic control setup only. Casting adjustments shall not be 3 permitted between 9:00pm and 7:00am. 4 5 The early start time to begin traffic control only shall be requested and approved by the 6 Engineer at the preconstruction conference. The Engineer has the right to disallow the 7 early start if the Contractor performs other work than traffic control setup. All mitigation 8 measures stated in the contract and appendix shall be adhered to. 9 10 Colby Ave – 41st St to 40th St 11 No lane closures or single lane alternating flagging operation will be permitted between 12 5:00am and 6:00pm. Casting adjustments shall not be permitted between 2:00pm and 13 5:00pm. A detour for night work may be approved by City Traffic Engineering. 14 15 A noise variance has been obtained on behalf of the Contractor. All mitigation 16 measures stated in the contract and appendix shall be adhered to. 17 18 Pacific Ave – Fulton St to Pine St 19 No lane closures or single lane alternating flagging operation will be permitted between 20 4:30am and 7:00pm. A detour for night work shall be in place. Casting adjustments 21 shall not be permitted between 2:30pm and 4:30pm. 22 23 A noise variance has been obtained on behalf of the Contractor. All mitigation 24 measures stated in the contract and appendix shall be adhered to. 25 26 W Casino Rd – Airport Rd to 5th Ave W 27 *Work shall not be permitted while school is in session.* 28 No lane closures or single lane alternating flagging operation will be permitted between 29 10:00pm and 7:00am. One way traffic eastbound shall be maintained at all times. A 30 westbound traffic detour shall be in place. Casting adjustments shall not be permitted 31 between 9:00pm and 7:00am. 32 33 A noise variance for early start has been obtained on behalf of the Contractor. The 34 early start time to begin traffic control only shall be requested and approved by the 35 Engineer at the preconstruction conference. The Engineer has the right to disallow the 36 early start if the Contractor performs other work than traffic control setup. All mitigation 37 measures stated in the contract and appendix shall be adhered to. 38 39 Alley between Nassau St and Norton Ave – Pacific Ave to 32nd St 40 *Work shall be sequenced for grinding between 5:00pm and 10:00pm on Friday and 41 paving between 8:00am and 5:00pm on the following Saturday.* 42 43 No lane closures or single lane alternating flagging operation will be permitted between 44 10:00pm and 7:00am. The contractor has been granted a 1 hour early start from 45 6:00am to 7:00am for traffic control setup only. Casting adjustments shall not be 46 permitted between 9:00pm and 7:00am. 47 48 A noise variance for night work has been obtained on behalf of the Contractor. The 49 early start time to begin traffic control only shall be requested and approved by the 50 Engineer at the preconstruction conference. The Engineer has the right to disallow the 51
The URL can be used to link to this page
Your browser does not support the video tag.