My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lakeside Industries, Inc. 5/3/2024
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2024
>
Lakeside Industries, Inc. 5/3/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2024 8:35:52 AM
Creation date
5/3/2024 8:28:40 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Lakeside Industries, Inc.
Approval Date
5/3/2024
Council Approval Date
5/8/2024
End Date
8/31/2024
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2024 Pavement Maintenance Overlay
Tracking Number
0004332
Total Compensation
$2,540,916.30
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
277
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
2024 Pavement Maintenance Overlay SPECIAL PROVISIONS PW# 3823 76 (******) 1 "Vehicle Loop Detectors," per linear foot. 2 3 The unit contract price shall include saw cutting, cleaning and drying of pavement, 4 installing loops and home runs, loop lead-in conduits, loop wire, sealant, splice kit and 5 splicing between loop wire and lead-on cable, any work necessary to access a junction 6 box and testing of the vehicle detectors as defined in Section 8-20.3(14)D. 7 8 No payment shall be made for any loops that are not spliced and fully operational, 9 including any loop detector lead in cable required to make the loop operational. 10 11 “Loop Detector Lead-In Cable”, per linear foot. 12 13 The unit contract price shall be full pay for furnishing and installing each loop detector 14 lead-In cable in existing conduits between the traffic signal control cabinet and loop splice 15 point, including all and all other Work necessary terminate loop lead in cable at either end. 16 17 No payment shall be made for any detector lead-in cable that is not spliced and fully 18 operational, including any testing required to make the loop operational. 19 20 “Conduit Pipe 2 In. Diam.”, per linear foot. 21 The unit contract price shall be full pay as described in this Section for furnishing and 22 installing each conduit stub-out where shown in the Plans, including furnishing all conduit, 23 elbows, bends, and fittings for placing the pipe in accordance with the above provisions, 24 including all excavation or jacking required, backfilling of any voids around stub out, pits, 25 or trenches; bedding of the pipe, chipping of pavement, and all other Work necessary for 26 the construction of the conduit stub-out. 27 28 “Video Detection System ____”, lump sum. 29 30 The lump sum Contract price for “Video Detection System ____”, shall be full pay for the 31 construction of the complete video detection system as described above and as shown 32 in the Plans, and herein specified, including complete installation of owner furnished 33 materials to provide a fully functioning video detection system at the location described. 34 The Contract price shall include restoring facilities destroyed or damaged during 35 construction, salvaging existing materials, and for making all required tests. All additional 36 materials and labor, not shown in the Plans or called for herein and which are required to 37 complete the video detection system, shall be included in the lump sum Contract price. 38 Removal and salvage of existing materials associated with the construction not shown in 39 the Plans or called for herein and which are required to complete the video detection 40 system, shall be included in the lump sum Contract price. 41 42 43 CNH 8-22 PMNT MARKING-Type D.rtf 44 8-22 PAVEMENT MARKING 45 (******) 46 47 Section 8-22 of the Standard Specification is supplemented by the following: 48 49
The URL can be used to link to this page
Your browser does not support the video tag.